Rx Trip Flashcards
For the Reactor Coolant Flow Rate - Low 2 Reactor Trip, what is the set point and coincidence?
90% (2/4 on 1/2) Hot Legs
For the Pressurizer Pressure - High 2 Reactor Trip, what is the set point and coincidence?
2420.3 psig (2/4)
For the Power Range Flux - High (High) Reactor Trip, what is the set point and coincidence?
109 % RTP (2/4)
- Note:*
- C-2 /// PR Flux ≥103 % RTP (2/4)*
- Blocks auto / manual Rod withdrawal for:*
- M Banks
- AO Banks
When are the DAS Rx trips applicable?
Mode 1
TRM 3.3.1 DAS Automatic Actuation
Located in Note
The Source Range Flux - High reactor trip is applicable in what mode(s)?
Mode 2 w/ IR neutron flux < P-6
Mode 3 - 5:
- PLS capable of rod withdrawal
OR - ≥ 1 rod not fully inserted
LCO 3.3.2 RTS Source Range Instrumentation
P-6 /// Divisional IR ≥ 1 E-5% RTP
What is the purpose / function of the DAS reactor trips?
Satisfies 10 CFR 50.62 (ATWS Rule)
Provides margin in the PRA
For the Intermediate Range Flux - High Reactor Trip, what is the set point and coincidence?
25 % RTP (2/4)
Note:
- C-1 /// IR Flux ≥15 % RTP (2/4)*
- Blocks auto / manual rod withdrawal for:*
- M Banks
- AO Banks
- Manual Block: ≥ P-10*
- Auto Unblock: < P-10*
- *
P-10 /// Divisional PR ≥ 10 % RTP
For the Power Range Positive Flux Rate - High Reactor Trip, what is the set point and coincidence?
12 % RTP w/ 60 sec TC (2/4)
The Intermediate Range Flux - High reactor trip is applicable in what mode(s)?
Mode 1 w/ PR Neutron Flux < P-10
Mode 2
LCO 3.3.3 RTS IR Instrumentation
P-10 /// Divisional PR ≥ 10% RTP
Which reactor trip(s) protect the plant from an uncontrolled reactivity accident?
Low
Source Range Flux - High (< P-6)
- 1x105 CPS (2/4)*
- *
Mid
Intermediate Range Flux - High (≥ P-6 / < P-10)
25 % RTP (2/4)
Power Range Flux - High (Low) (≥ P-6 / < P-10)
- 25 % RTP (2/4)*
- *
High
Power Range Flux - High (High) (≥ P-10)
109 % RTP (2/4)
Power Range Positive Flux Rate (High) (≥ P-10)
- 12% RTP w/ 60 sec TC*
- *
P-6 /// Divisional IR ≥ 1 E-5 % RTP
P-10 /// Divisional PR ≥ 10 % RTP
What are all the PMS Reactor Trips?
Power:
- Source Range Flux - High
- Intermediate Range Flux - High
- Power Range Flux - High (Low)
- Power Range Flux - High (High)
- Power Range Positive Flux Rate - High
RCP / Flow
- RCP Bearing Water Temp - High 2
- RCP Speed - Low 2
- Reactor Coolant Flow Rate - Low 2
Calorimetric Comparison
- Overtemperature ∆T (OT∆T)
- Overpower ∆T (OP∆T)
Pressurizer
- Pressurizer Pressure - Low 2
- Pressurizer Pressure - High 2
- Pressurizer Water Level - High 3
Steam Generator
- SG NR Water Level - Low 2
- SG NR Water Level - High 3
System / Manual
- Safeguards (Manual / Auto)
- ADS (Manual / Auto)
- CMT (Manual / Auto)
- PRHR (Manual / Auto)
- Manual
Which PMS Reactor Trips are interlocked with P-9 (Divisional Tavg ≥ 200°F)?
SG NR Water Level - Low 2
Manual Block < P-9 / Auto Unblock ≥ P-9
21 % (2/4 on 1/2)
P-9 /// Divisional Tavg ≥ 200°F
For the Source Range Flux - High Reactor Trip, what is the set point and coincidence?
1 E5 CPS (2/4)
Manual Block ≥ P-6
Auto Block ≥ P-10
Auto Unblock < P-6
P-6 /// Divisional IR ≥ 1 E-5 % RTP
P-10 /// Division PR ≥ 10 % RTP
- Note:*
- Blocking Source Range Flux - High de-energizes source range nuclear instrument.*
For the Power Range Flux - High (Low Setpoint) Reactor Trip, what is the set point and coincidence?
25 % RTP (2/4)
For the SG WR Level - Low DAS Reactor Trip, what is the set point and coincidence?
26 % (1/2 on 2/2) TD