RULE I- RULE III Flashcards
Presidential Decree 1096 is also known as the ___
National Building code of the Philippines
Who shall serve as the technical staff of the Secretary in the administration and enforcement of the provisions of PD 1096 and its IRR?
National Building Code Development Office (NBCDO)
Any new construction which increases the height and/ or floor area of existing building/structures
Addition
Works in buildings/ structures involving changes in the materials used, partitioning, location/ size of openings, structural parts, existing utilities and equipment but does not increase the building height and/or floor area.
Alteration
the Executive Offices of the OBO appointed by the Secretary
Building Official
A document issued by the Building Official to an owner/ applicant to proceed with the construction, installation, addition, alteration, renovation, conversion, repair, moving, demolition and other work activity of a specific project/ building/ structure or portions thereof after the accompanying principal plans, specifications and other pertinent documents with the duly notarized application are found satisfactory and substantially conforming with the National Building Code of the Philippines ( the Code) and its Implementing Rules and Regulations (IRR)
Building Permit
PD 1096, otherwise known as the National Building Code of the Philippines
Code
All on-site work done in the site preparation, excavation, foundation, assembly of all the components and installation of utilities, machineries and equipment of buildings/ structure.
Construction
A change in the use or occupancy of buildings/ structures or any portion/s thereof, which has different requirements
Conversion
The systematic dismantling or destruction of a building/ structure, in whole or in part.
Demolition
The Executive Officer or Head of the NBCDO
Executive Director
The transfer of buildings/ structures or portion/ s thereof from original location or position to another, either within the same lot or to a different one.
Moving
The office authorized to enforce the provisions of the Code and its IRR in the field as well as the enforcement of orders and decisions made pursuant thereto.
Office of the Building Official (OBO)
Any physical change made on buildings /s structures to increase the value, quality and/ or to improve the aesthetic.
Renovation
Remedial work done on any damaged or deteriorated portion/s of buildings/ structure to restore to its original condition
Repair
Head or Chief Executive Officer of DPWH
Secretary
The personnel of the National Building Code Development Office (NBCDO)
Staff
Qualifications of Building Officials
A Filipino citizen and of good moral character
A duly registered Architect or Civil Engineer
A member of good standing of a duly accredited organization of his profession for not less than years endorsed or recommended by the accredited professional organization.
Has at least 5 years of diversified and professional experience in building design and construction
Has attended and successfully completed a seminar or workshop on PD1096 and its IRR conducted by the DPWH.
Building Official shall retain not more than __ of the income/collection derived from permit fees and other charges for the operating expenses of his office.
20%