Rule 8 Light And Ventilation Flashcards
Open space for inside lot
20% of TLA
Open space for interior lot
50% of TLA
Open space for corner lot
10% of TLA
Open space for through lot
10% of TLA
Open space for corner-through lot
5% of TLA
Open space for cornet lot abutting 3 or more street,alley or river
5% of TLA
Open space for end lot
30-50% of TLA
Minimum court and yard dimension
2.00 m
Minimum inner court passageway width
1.20 m
Front setback for R1 development
4.50 m
Front setback for basic R2 development
3.00 m
Front setback for maximum R2 development
8.00 m
Front set back for basic R3 development
3.00 m
Front setback for maximum R3 development
8.00 m
Front setback for R4 development
4.50 m
Front setback for R5 development
6.00 m
Rear and side setback for R1-R4 development
2.00 m
Rear and side setback for R5 development
3.00 m
Front setback for RROW 30 m and above
8.00 m
Front setback for RROW 25-29 meter
6.00 m
Front setback for RROW 20-24 meter
5.00 m
Front setback for RROW 10-19 meter
5.00 m
Front setback for RROW below 10 meter
5.00 m
Side and rear setback for RROW 30 meter and above
5.00 m
Side and rear setback for RROW 25-29 meter
3.00 m
Side and rear setback for RROW 20-24 meter
3.00 m
Side and rear setback for RROW 10-19 meter
2.00 m
Side and rear setback for RROW below 10 meter
2.00 m
Minimum width of the court
2.00 m
Incremental setback for buildings more than 2 storey up to 14 storey
0.30 m
Minimum height of firewall above roofline
0.40 m
Recommended firewall setback to create drainage
0.60 m
Minimum Ceiling height for habitable room with artificial ventilation
2.40 m
Minimum Ceiling height for habitable room naturally ventilated
2.70 m