RQ-C-4833 (250 VDC Distribution) Flashcards
1
Q
What impact does loss of DC control power have on the EDG
A
- EDG will not start. If running, only trips available are mechanical overspeed and the MFV
2
Q
What impact does loss of DC control power have on 4 kV breakers
A
- Cannot be operated from the control room and no automatic functions available
3
Q
What is the normal power supply for the Train A 250 VDC distribution
A
- 600 VAC ESS system via battery charger rectifier
4
Q
What would a plant battery charger float current of greater than 2 amps mean when the battery has been isolated from any active charger for some time before restoration
A
- Battery has discharged and the charger is restoring it to full voltage
5
Q
What loads must be manually shed from the BOP battery following a loss of all AC
A
- DCS inverters and the Main and MFP emergency oil pumps (2 hours)
6
Q
Why are loads manually shed from the BOP battery following a loss of all AC
A
- To maintain BOP battery capacity for 8 hours to maintain the Emergency Generator Seal Oil Pump (retains H2 in Generator)
7
Q
Can the BOP battery chargers be manually restored following a load shed
A
- No. Buses that are load shed are not recovered. BOP battery supplies the loads
8
Q
What N train battery load must be load shed following a loss of all AC
A
- AMSAC inverter