ROAD CONSTRUCTION METHODS Flashcards

Quiz

1
Q

Triangular shape with one side horizontal

A

Danger warning signs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Average dept of embankment material needed to place on top of natural ground

A

Fill

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

A road by which a job is connected to the highway system, used in connection with borrow pits

A

Access Roads

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Lines laid ACROSS the direction of travel

A

Transverse

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Lines laid IN the direction of Travel

A

Longitudinal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Employed to inform road users of route, destinations and other pertinent traffic

A

Guiding Device

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Marker that are Rectangular w/ series of alternating black & white bands

A

Hazards

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Provide space for the expansion of the pavement, preventing compressive stress

A

Expansion Joint

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Road Marking should be of ____ and should protrude more than 6mm above level of the carriage way

A

Non skid material

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Measure of concrete fluidity

A

Consistency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Brooming should not be more than ___ in depth

A

1.5mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Used to restrain and guide out of control vehicles that will cause least damage

A

Guard Rails

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Concrete Vibrators are not allowed to be operated longer than ____ seconds

A

15

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Simplest form of road by shaping and smoothing natural soil

A

Earth Road

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Ensure adhesion of the surface course to the binder course

A

Tack Coat

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Composed of one part Portland Cement and two parts Aggregate so and water to handle it easily

A

Mortar

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Painted sticks placed along the side of the road as guide and reference in elevation

A

Blue Tops

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Signs round and in blue colors

A

Obligatory

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Located beneath or alongside the roadway collecting surface water

A

Drainage structure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Means by which road users is advised as to detailed requirements affecting road use

A

Traffic Control Devices

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Concrete’s ability to be placed in a prepared form w/o honeycomb

A

Workability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Removal of saturated mixtures of soils and organic matter

A

Unsuitable Excavation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Forms should be made of ___ of an approved section

A

Steel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Undertaken after the curing period before the pavement is opened

A

Sealing of Joints

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Removing earth from its original position in a cut
Excavation
26
Small rectangle device fixed to the pavement surface supplement pavement markings
Raised Pavement Markers
27
Used for lane control. White in color, 5m in length (urban) 7.5m in high speed road
Pavement arrow
28
Earth fill below the pavement to raise the road
Embankment
29
Excavation of common materials used as embankment fill
Common Excavation
30
Constructed when there's an interruption of more than 30 mins in concreting
Construction Joint
31
PCCP (Abbrev meaning)
Portland and Concrete Cement Pavement
32
structure that link barangays and cities in the country, serves as medium in transporting goods
Road
33
Philippine Traffic signs conform to the _____ of the United Nations on Road traffic and Road Signs
1968 Vienna Conventions
34
Pressing of soil particles to expel air from the mass and filling the voids to make the material more dense
Compaction
35
Used to inform road users of potentially hazardous roadway conditions
Warning Devices
36
it is sometimes termed as an all weather road
Gravel Road
37
tool for economic road building, material conservation, investment protection and roadway upgrading
Soil Stabilization
38
Conducted on site in order to determine if the required compaction specification has been attained
Field Density Test
39
A bituminous layer below the surface or wearing course
Binder Course
40
The uppermost structural component of the roadway, provide resistances to wear and shearing stress
Surface Course
41
Average depth needed in excavating the natural found to satisfy the designed grade
Cut / Excavation
42
Serves to provide structural capacity to bituminous concrete slabs
Base and Subbase courses
43
Signs that are small and rectangular, supplement information on the main sign
Additional Information
44
Necessary to divert traffic from any existing roadway whenever the construction operations block the flow of traffic
Detour Roads
45
Done within 24 hours after concrete pouring water using cooled diamond edge saw blade
Concrete Sawing
46
Signs shall have a yellow background and red border
Yield
47
Determines actual position of the road structure based on the plans
AS-Stake Survey
48
Structural layer which accepts greater compressive stress than the subgrade and reduces the deformation of the pavement
Subbase Course
49
Essential ingredient in rigid pavements, most structural concrete
PC - Portland Cement
50
The upper layer of natural soil which may be undisturbed local materials or soil elsewhere
Subgrade
51
used to grade concrete in such manner to prevent segregation
Screeding
52
Three Elements of the Road System
The Road The Vehicle The Driver
53
Forms for concrete shall remain in place undisturbed within ___ hours after pouring
24
54
Deformed bars used in construction and longitudinal joints together with keys to tie 2 slabs together
Tie bars
55
Load transfer devices in joints to transfer loads from one slab to another
Dowels
56
small reflective panels mounted on guide post as an effective aid for night driving
Delineators
57
Suitable material from sources outside the roadway
Borrow
58
Layer of material placed on an existing surface to eliminate irregularities placing an overlaying course
Leveling Course
59
Signs are rectangular with a white or yellow plate with a symbol that stands for service
Information Sign
60
Excavation and disposal of materials regardless of its nature
Unclassified Excavation
61
Normally consist of lines, patterns words and symbols
Traffic Markings
62
After grouting, the surface is cured for a period of at least __ days from installation
3 days
63
____ shape shall be used for STOP signs only
Octagonal
64
are normally used in expansion joints, and their diameter, spacing and length would be similar to that indicated for contraction joints
Dowel Bars
65
Upper level of natural soil which may be undisturbed local materials
Subgrade
66
After the concrete has been struck off and consolidated, it is further smoothed by means of ________
Floating
67
______ shape shall be used for regulating traffic
Round
68
Suitable native material obtained from roadway cuts or borrow areas
Selected Borrow
69
Employed more FREQUENTLY than any other devices to regulate, warn or guide road users
Traffic Signs
70
Suitable materials which can be common or rock which are brought and compacted together to form a stable embankment
Embankment Fill
71
Means removing and disposing all surface objects including vegetation tress and other objects not designated along the roadway
Clearing and Grubbing
72
Substance other than aggregates water and Portland cement that can be added to concrete to improve its properties
Admixture
73
serves to stabilize the base and bind it to the paving material
Prime Coat
74
meant to stabilize the foundation bed to avoid possible settlement that impair the function of drainage
Foundation Fill
75
Are suitable materials excavated along the road traverse which are disposed as excess of embankment
Surplus Excavation
76
necessary for the hydration to take place so that the concrete may harden properly and prevent loss of moisture during curing
Concrete Curing
76
Maximum number of words that can be placed as pavement marking
3
77
should be smooth yet skid resistant, quiet when in contact with tires
Wearing Course
78
made of mineral aggregate mixed with asphalt laid at high temperature of 275 to 300 deg.
Asphalt Concrete Pavement
79
Angle of constructed soil plane usually expressed in proportion of length and depth
Slope
80
Consists of igneous, sedimentary and metamorphic rocks which cannot be excavated with blasting
Rock Excavation
81
Constructed along side the road as protection from erosion
Slope Protection
82
described as flexible pavement
Asphalt Road
83
Fill may be obtained by _________ with bulldozer from borrow pits
Quarrying
84
Describe the compressive strength of concrete mix
Water-Cement Ratio
85
Compaction Trial of not less than ____ sq.m is done to determine the actual capability of compaction
500
86
treatment applied to concrete during hardening period to protect against early shrinkage due to lose of moisture
Curing Agent
87
Raised rim of concrete which forms the edge of the sidewalk
Curb and Gutter
88
Provided to relieve the tensile stresses due to temperature
Contraction Joint