risk management Flashcards
what is a BIA?
business impact analysis is a process to determine sources and relative impact values of risk elements in a process
What is the RTO?
recovery time object describes target time set for resumption of operations
what is the RPO?
recovery point objective is maximum amount of time of acceptable data loss
difference between RTO and RPO
RTO defines requirements of business continuity and RPO deals with backup frequency
what is the MTBF?
mean time between failures
MTTR?
mean time to repair
MTBF formula
(start of downtime - start of uptime) / number of failures
MTTR formula
(total downtime) / (number of breakdowns)
availability formula
MTBF / (MTBF+MTTR)
what is impact?
cost associated with a realized risk
what is risk?
chance of something not working as planned and causing adverse impact
privacy impact assessment
analysis of how PII is handled through business process
privacy threshold assessment
analysis of whether PII is collected and maintained by a system. then analysis of risk done through PIA
what is SLE
single loss expectancy
what is ale
annual loss expectancy (ALE)