Right Of Way Flashcards
The track bed may consist of____or_____ and ties
concrete, ballast
the construction of the floating concrete slabs support pads are_____ round by _____thick and support the concrete
6ft round
3 ft thick
the running rails used by metro are continuous welded steel rails
true
in some instances a floating concrete slab may be used to lessen_____and _____
vibration, noise
the running rails act as the _______for the electric traction power system
negative return
_______,______,_______ are all terms for switches
shunt, interlocking, crossover
a _____ is a point where the train can move from one track to another
switch
the switches in the metro system use _______ electric power to operate
AC
switches are controlled by_______and are activated by computer
occ
cribbing used to block a switch should be in ____,_____,________ size with an angled point at one end
2x4,4x4,6x6
_______are a system of measurement along with right of way
chain markers
chain markers are located every_______ feet along with line
100
the letter in the chain marker identifies the _________
route
the first number in the chain marker identifies the ___________
track
the color in the chain marker identifies the __________
line
the series of numbers at the bottom of a chain marker identify the
distance from the center hub
chain markers will be found on ____ along the At grade or elevated right of way and found on______ in the tunnels
post, walls
all tunnels are equipped with ____ lights
fluorescent
the maximum travel distance to any emergency exit shaft will be_____feet
1250
double width box tunnels are______feet wide
29
horseshoe tunnels are carved out of rock and are _____ feet wide
15
the safety walk is _____inches
22