RIC Flashcards
1
Q
5 donts of thermal imaging
A
- Dont lock on to the screen
- Dont mistake sight for saftey
- Dont expect victims to be white
- Dont forget the basics
- Dont expect it to do everything
2
Q
LUNAR
A
Location Unit Name Assignment Resources needed
3
Q
Tools Cache for the RIC Tarp
A
START UP RIC
Saws, Tic, Air bottles, RIC bag, Utilize portable Lights, Portable Generator, Rope Bag, Irons, Communications
4
Q
Ric Procedures
A
3rd In company is RIC.
Hydrant Man and Engineer Set up ric Cache
Nozzleman and Captain do a hotlap Softening the structure, securing utilitys, looking for any special hazards then do a face to face with IC
5
Q
RIC Activation Procedures
A
Engineer is Access control monitoring who goes in and out. Has 2 radios one on Tac 3 the other on tac 2 scanning Tac 1
Hydrant man has TIC
Nozzleman has IRONs and Ric bag
Captain with second TIC