- What are the CDM regulations?
CDM (Construction Design & Management) regulations 2015 intend to ensure that health and safety issues are properly considered during a projects development so that the risk of harm to those who have to build, use and maintain structures is reduced.
- What are the duty holder under CDM 2015?
- Clients
- Designers
- Principal designers
- Principal Contractors
- Contractors
- Workers
- What changed under CDM 2015?
- Replacement of ‘CDM Co-ordinator; role with ‘Principal Designer’
- Removing the exemption for domestic clients, but passing their CDM duties to the contractor
- Structural simplification of regulations to make them easier to understand
- Who is responsible for issuing the F10 notification?
Client is responsible for notifying HSE of project commencement (F10). Usually appoints PD / Consultant to do this.
- What are you and your clients duties under CDM 2015?`
My responsibility is to inform my client of their responsibilities
Client’s
- Provide pre-construction information to designers
- Ensure other duty-holders are appointed
- Ensure welfare facilities are provided
- Ensure construction H&S phase plan is in place
- Appoint PD and PC with suitable skills, knowledge and experience
- When does a Project need to be notified to the HSE?
Work longer than 30 working days and have more than 20 workers simultaneously
OR
Exceed 500 person days
CP 1. How do you go about choosing a contract for a project?
There are various factors to consider
- Type of procurement route used
- Size of the project (forecast of cost will determine e.g. minor works / intermediate etc)
- Type of client (lawyer preferences)
- Type of works (e.g engineering, repeat works)
CP 2. What contracts are available in the construction industry?
- NEC
- JCT
- FIDIC
- NFDC
CP 3. Do you know of any guidance for contract selection?
RICS guidance note : Appropriate contract selection
JCT deciding on the appropriate JCT contract (2016)
CP 4. What is an Extension of time?
An adjustment to the completion date, relieving the contractors liability to pay L.A.D’s
CP 5. How have you managed an Extension of Time?
I have referred to the relevant contract clauses (in JCT DB 2011 it is 2.23 - 2.26)
- Review contractors notice
- Ask for extra information if required to assess / review
- Assess whether a relevant event / relevant matter
- After my assessment I write to the contractor giving details of my decisions and any EoT granted
CT 1. What are the Building Regulations?
Building Act 1984
Building regulations are minimum standards for design, construction and alterations to virtually every building. The regulations are developed by the UK government and approved by parliament.
The building regulations 2010 are supported by approved documents.
Approved documents set out detailed practical guidance on compliance with the regulations.
CT 2. Do you know any Building Regulations?
A = Structural safety B = Fire safety C = D = Toxic Substances E = Resistance to passage of sound
K = Protection from falling
CT 3. Where are the building regulations located?
gov.uk website
CT 4. What building regulation covers ‘Acoustics’?
Approved document E - Resistance to passage of sound