Remote Shutdown Flashcards
What are entry conditions for remote shutdown?
Any condition requiring plant to be shut down remotely except a major fire in control room or cable spreading room.
What actions are taken by the SM?
Proceeds to TSC, reference EALs, monitor plant and impement EOPs as needed
What actions are taken by the CRS?
1) Trips CRDs at the breakers
2) Direct ROs to control SG levels as needed (30”), RCS pressure (2050 to 2250#) using PZR proportionals locally, pzr level (220”) by throttling HPI block is level lowering (CV-1220/1285) and Letdown to lower level, Mu tank level and SG pressure (ROs can take manual control of TBV if not 950 to 1020#).
What indications are on the dasey panel?
1) Source Range Power
2) Int range power
3) SG SU level
4) PZR lvl
5) Main Steam pressure
6) RCS pressure
7) Tcold
8) MU tank Lvl
What actions are taken by RO1?
1) Open BWST outlet (CV-1407) at B-51
2) Start P-75 from breaker, trip MFPs, ensure CV-2827 open, and check Main and LL block valves closed (Just trip MFPs if EFW only thing availabe and don’t open MS to E-2)
3) Open MS to E-2 valves
4) If directed open HPI block (CV-1220 at B-51) and control TBVs manually
What major actions are taken by RO#2?
1) Open CV-1408 at B-61
2) Close CV-1221 at B-61
3) Close Makeup Block valve at B-62
4) Open polisher bypass and close MOV inlets to all polishers
5) If directed bleed using CV-1248 from B-31, operate CV-1275 from B-56, operate CV-1285 HPI Block from B-62, Operate TBV manually and monitor instrument rack outside orange door
If EFW, same first 3 steps, check EFW valves open at breakers.
How is the reactor shutdown in remote shutdown?
CRS trips CRD AC breakers
How is RCS inventory controlled in remote shutdown?
Normal makeup and letdown is isolated by RO#2. PZR level is controlled by opening HPI block or putting letdown in service.