Reading-Paddington (up) Flashcards
Departing Platform 10 Signal T1688, state the location of your next signal
Gantry No.1 (New Junction) T1672 Up Main
Departing platform 7 signal T1682, Platform 8 T1684, and Platform 9 T1686, state the location of your next signal
Gantry No.1 (New Junction) T1670 Down Main
Departing Platform 12 Signal T1692, state the location of your next signal
Gantry No.1 (New Junction) T1674 Down Relief
Departing Platform 13 Signal T1694, identify the route indications and state the location of your next signal
Main Aspect - T1674 Down Relief
J.I.1 – T1676 Up Relief
J.I.2 – Reading Low Level
Gantry No.1 (New Junction)
Departing Platform 14 Signal T1696,identify the route indications and state the location of your next signal
Main Aspect - T1676 Up Relief
J.I.1 – Reading Low Level
J.I.4 – T1674 Down Relief
Gantry No.1 (New Junction)
Departing Platform 15 Signal T1698, Identify the route indications and state the location of your next signal
Main Aspect - T1676 Up Relief
J.I.1 – Reading Low Level
Gantry No.1 (New Junction)
State the speed of the scissor crossover immediately after departing platforms 13 & 14
25mph
Gantry 1, identify the route indication you require when being signalled into Kennett Bridge Passenger Loop
Route Indication ‘L’
Gantry 1 Down Main Up direction, identify the routes from this signal
J.I.1 – Up Main
J.I.2 – Up Relief
J.I.4 – Up Reading Spur (Southern)
L – Kennett Bridge Loop
What is the name of the first 2 Junctions when leaving Reading Station and what is the speed through the 2nd Junction
Reading New Junction
Kennett Bridge Junction 40mph
If routed into Kennett Bridge Passenger Loop, state the location and type of your next signal
Located on the right hand side Fixed Red type signal T1656
Sequentially name the Signalling Centres controlling the route between Reading and London Paddington Station and the areas they control
TVSC Reading Station - reading station / westbury line junction
TVSC Twyford - Maidenhead to Kennet Bridge
Slough West - Slough to Maidenhead
Slough East - Iver to Slough
TVSC Hayes - Wharncliffe to West Drayton
TVSC Acton - Old Oak East to Hanwell
TVSC Paddington - Paddington to Old Oak East
From Kennett Bridge Loop via the Up Main the line speed increases to 125mph. State the location and the next change of speed on the Up Main line.
Acton West 85/MU100
When departing Reading Station via the Up relief, what is the next speed?
60/MU90
Are loco hauled trains included in the “MU” speeds over this route or must they take the lower speed?
No, loco hauled trains must take the lower speed. MU are for multiple unit trains which also include HST
On both the Up and Down Relief lines, where the line speed is over 75mph, what are the potential risks when running under cautionary aspects
Although the signal spacing on both the Up and Down relief is compliant, it is near the required minimum standard, therefore proactive braking techniques are required when encountering restrictive aspects.
State the names of the stations between Reading and Slough
Twyford
Maidenhead
Taplow
Burnham
On passing through Sonning Cutting on the Up Main, you observe flashing yellow aspects, state the route you are being signalled to and the speed of the crossover
Up Main to Up Relief 40mph crossover
How would you dispatch a DOO passenger train from the Up Relief platform at Twyford Station?
Look back
After departing Twyford, state the next crossover from Up Relief to Up Main
Ruscombe
What is the maximum speed over the Junction at Ruscombe when going from the Up Relief line to the Up Main line?
70 mph
Splitting distant signal UR30B, describe the splitting distant aspects and the routes applicable (continued on next page)
Red on 4 aspect head. Nothing on 3 aspect head
Single yellow on 4 aspect head Nothing on 3 aspect head
Single yellow on 4 aspect head. Double yellow on 3 aspect
Danger – STOP
Caution - Proceed Be prepared to stop at next signal
Preliminary Caution - Proceed Be prepared to find the next signal displaying one yellow for the Up Relief line route
Splitting distant signal UR30B, describe the splitting distant aspects and the routes applicable (continued on next page)
Yellow on 4 aspect head. Green on 3 aspect head
Double yellow on 4 aspect head S/yellow on 3 aspect head
Green on 4 aspect head. Single yellow on 3 aspect
Green - Proceed Next signal displaying a proceed aspect for the Up Relief line route
Preliminary Caution - Proceed Next signal displaying one yellow with junction indicator position 4 for the diverging route.
Be prepared to stop at first signal beyond the junction on the diverging route
Clear - Proceed
Next signal displaying a proceed aspect with junction indicator position 4 for the diverging route.
Following on from Ruscombe, where can your train next be routed from the Up Relief line to the Up Main line?
Maidenhead East Junction.
Flashing single yellow!
State the line speed through Maidenhead station on the Up Relief and state the risks associated with the approach to this speed?
75mph
No Advance Warning Board
How would you dispatch a DOO passenger train from the Up Main platform at Maidenhead Station?
By the use of DOO mirrors
Are you able to call at Taplow Station on the Up or Down Main line?
No. Although there are platforms located on both the Up and Down Main lines, the low height and physical state of the platforms currently preclude trains from safely using them for passenger services. (Except in an emergency, where a controlled evacuation of the train may take place on the Main line platforms)