Reading Area Up Direction Flashcards

1
Q

After changing ends at Tilehurst, identify any potential risks

A

Turn back signal on right hand side

Risk of read across to Up Relief signal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the speed of the movement from the Down Relief at Tilehurst to the Up Relief

A

70MPH

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

TR145 Up relief at Reading West Junction – identify the routes from this signal and the speed crossing over Reading West Junction

A

Main Aspect = Up Relief
J.I.4 = Festival Line
J.I.5 = West Curve

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

On the Up Main the first signal on Reading Viaduct T1742 what routes are available from this signal and what are the speeds

A

Main Aspect = Up Main 60MPH
J.I.4 = Down Main ( Up Direction ) 50MPH over Crossover
J.I.5 = Festival Line 50MPH over Crossover

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Following the previous question, where are the next signals

A

Reading High Level Junction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

State the speed of the crossover into the Down Main Loop Platform

A

40MPH

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Signal T1732, up Reading Passenger Loop located adjacent to the TCD East Sidings – describe the route indications you can receive when being signalled towards the closing up signals

A

Main Aspect Platform 15 (UR)
Junction Indicator 4 Platform 14 (URL)
Junction Indicator 5 Platform 13 (DRL)
Junction Indicator 6 Platform 12 (DR)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

With reference to the last question, state the slowest speed for a movement from
signal T1732

A

25MPH

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are the risks for trains approaching platforms 12 to 15 at Reading?

A

Risk of forgetting about closing up signals before platforms, if T1732 or T1730 at single yellow
Risk of reading across on the closing up signals on gantry

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

T1706 closing up signal on the up relief approaching platform 15 – describe the
location of this signal and any infrastructure/signage in the vicinity of this signal

A

Located on the right hand side on a gantry
Round white sign next to the signal with a black arrow pointing to the up relief
Large black plate fixed to the right of the signal to mitigate the risk of a read through for
trains approaching the station from the Westbury Line

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Describe the instructions when you are required to stop at the rear end clear
markers

A

Trains up to 5 cars must come to a stand at the rear clear marker at the B end of the
platform if they are booked to reverse or terminate and form a service towards Reading
West / Tilehurst / TCD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Describe the instructions when you are required to proceed beyond the rear end
clear markers

A

Trains of more than 5 cars, through services of any formation, or any formation terminating
and then continuing forward on a different service must continue beyond the ‘rear clear’
marker to the relevant car marker at the ‘A’ end of the platform

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Departing platform 7 (signal T1682), Platform 8 (signal T1684) , state the location of your next signal

A

Gantry 1 (New Junction) on the Down Main (T1670)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Departing Platform 10 (signal T1688), state the location of your next signal

A

Gantry 1 (New Junction) on the Up Main (T1672)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Departing Platform 12 (signal T1692), state the location of your next signal

A

Gantry 1 (New Junction) on the Down Relief (T1674)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Departing Platform 13 (signal T1694), identify the route indications and state the
location of your next signal

A

Main Aspect Down Relief
Junction Indicator 1 Up Relief
Junction Indicator 2 Reading Low Level
Next signal on gantry 1 (New Junction)

17
Q

Departing Platform 14 (signal T1696), identify the route indications and state the
location of your next signal

A

Main Aspect Up Relief
Junction Indicator 1 Reading Low Level
Junction Indicator 4 Down Relief
Next signal on gantry 1 (New Junction)

18
Q

Departing Platform 15 (signal T1698), identify the route indications and state the
location of your next signal

A

Main Aspect Up Relief
Junction Indicator 1 Reading Low Level
Next signal on gantry 1 (New Junction)

19
Q

State the speed of the scissor crossover immediately after departing platforms 13 &
14

A

25 mph

20
Q

Identify the preferred shunting route if you are required to shunt at the East end of the station

A

From platforms 7-15 into Kennet Loop and return from T1679

21
Q

Gantry 1 – identify the route indication you require when being signalled into
Kennet Passenger Loop

A

‘L’ in the theatre box

22
Q

Gantry 1 – Down Main, Up Direction – identify the routes from this signal

A

Junction Indicator 1 Up Main
Junction Indicator 2 Up Relief
Junction Indicator 4 Up Reading Spur
‘L’ in theatre box Kennet Loop

23
Q

If routed into Kennet Passenger Loop, state the location and type of your next
signal

A

Fixed red at the London end of the loop on the right hand side (T1656)