RAMADUNGAM SOLAR PLANT - ISA Flashcards
Which is the India’s Largest Solar Plant?
Ramadungam
How much energy will it generate?
100 MW
By whom is it declared?
National thermal Power Cooperation
It will be functional from
1st July , 2022
Where is it situated?
Near Godavari River
When was Telagana formed?
2 June , 2014
Under which act ,Telangana formed?
Andhra Pradesh reorganisation Act , 2014
NTPC is under which ministry?
Ministry of Power
RK SINGH
When was NTPC setup?
December 2015
When did it became a Maharatna Company?
2010
When did it became a Maharatna Company?
2010
What is the aim of NTPC?
become 130GW by 2032
Which scheme is To generate solar power by installing solar panels on the roof of the houses?
Rooftop Solar Scheme
By whom was it released?
Ministry of New and Renewable Energy (MNRE)
RK SINGH
Which scheme covers grid-connected Renewable Energy power plants (0.5 – 2 MW)/Solar water pumps/grid connected agriculture pumps?
PM-KUSUM(Kisan Urja Suraksha evam Utthaan Mahabhiyan)
Which policyis to provide a framework for promotion of large grid connected wind-solar PV hybrid systems for optimal and efficient utilization of wind and solar resources, transmission infrastructure and land?
National Wind-Solar Hybrid Policy
Which yojana was launched in September 2016 for the installation of solar street lighting (SSL) systems ?
AJAY scheme
Which focuses on a framework for facilitating global cooperation, building a global ecosystem of interconnected renewable energy resources (mainly solar energy) that can be seamlessly shared.?
One Sun, One World, One Grid (OSOWOG)
Which is an Indian initiative that was launched by the Prime Minister of India and the President of France in COP-21?
Internation Solar Alliance