Quiz 15 Flashcards
According to LAFD Training Bulletin No. 35, “Overhaul Procedures”, the following are the main objectives of overhaul, except ____________.
A) To determine the most probable fire cause
B) To leave insurance adjusters a means to determine the fire loss
C) To provide for security of the premises before leaving the scene
D) To leave the occupants a means to retrieve their personal items
D) To leave the occupants a means to retrieve their personal items
According to LAFD Training Bulletin No. 35, “Overhaul Procedures”, the___________ shall determine at what point the emergency is to be officially declared abated and issue the order to “shut-down” and “pick-up”.
A) Company Commander
B) Incident Commander
C) Operations Commander
D) Arson Unit
B) Incident Commander
According to LAFD Training Bulletin No. 35, “Overhaul Procedures”, if conditions are favorable; i.e. distances are not excessive; no disruption of vehicular traffic, etc., overhaul piles may be located on a public way. __________ should be contacted for cleanup of overhaul piles left on public ways.
A) Street Maintenance
B) Transportation
C) Building & Safety
D) O.C.D.
A) Street Maintenance
According to LAFD Training Bulletin No. 35, “Overhaul Procedures”, larger fires require special planning. The number one priority when planning any overhaul is
___________.
A) Salvaging of sentimental items
B) Safety of the public
C) Safety of members
D) Locating the fire orgin
C) Safety of members
According to LAFD Training Bulletin No. 36, “Identification Of Phencyclidine And Clandestine Laboratories”, a variety of chemicals are used in PCP manufacture, the most lethal of which are potassium cyanide and hydrochloric acid which when mixed together produce _____________, the gas used in the gas chamber.
A) Sernylan
B) Hydrogen Cyanide Gas
C) Hydrogen Chloride Gas
D) Hydrochloride Acidic Gas
E) None of the above
B) Hydrogen Cyanide Gas
According to LAFD Training Bulletin No. 94, “Asbestos – Fire Prevention Bureau”, effective October 1, 1990, the Fire Department implemented a program, which requires a Division ______ Permit, and on-site inspection of all asbestos- abatement projects (over ______ square feet) in the City of Los Angeles.
A) 3, 75
B) 4, 100
C) 5, 100
D) 8, 200
C) 5, 100
According to LAFD Training Bulletin No. 94, “Asbestos – Chapter I Asbestos Abatement Procedures”, contractors must follow asbestos abatement procedures as per L.A.F.D. Bureau of Fire Prevention Requirement No. ____, after obtaining a permit.
A) 1
B) 55
C) 68
D) 92
C) 68
According to LAFD Training Bulletin No. 94, “Asbestos – Chapter III Fire Prevention and Training Exercises”, report any illegal/unsafe asbestos projects to the “Asbestos Abatement” Inspector or ________.
A) High-Rise Unit
B) O.C.D.
C) Department of Building & Safety
D) Public Safety Section
A) High-Rise Unit
According to LAFD Training Bulletin No. 94, “Asbestos – Chapter IV Asbestos Exposure Areas”, in high-rise buildings that have had the insulation removed from the structural steel, it is required to be replaced within _____ days.
A) 3
B) 5
C) 15
D) 28
C) 15
According to LAFD Training Bulletin No. 94, “Asbestos – Chapter IV Asbestos Exposure Areas”, steel-framed, high-rise buildings constructed prior to _____, used asbestos insulation on the steel members in order to meet the fire resistiveness required for fire safety.
A) 1940
B) 1973
C) 1979
D) 1983
B) 1973
According to LAFD Training Bulletin No. 94, “Asbestos Abatement – Chapter I Permits Required”, a permit for asbestos abatement is good for ____ days from the date of issue and only for the specific project for which it is issued.
A) 60
B) 90
C) 120
D) 180
D) 180
According to LAFD Training Bulletin No. 94, “Asbestos Abatement – Chapter III Allowable Locations”, in a single story building, a maximum of ____ percent of the total floor space may be under active abatement at any one time.
A) 20
B) 25
C) 50
D) 66
C) 50
According to LAFD Training Bulletin No. 94, “Asbestos Abatement – Chapter VI Fire Safety Watch”, in abatement areas protected by an approved functioning automatic fire detection system connected to the building’s Central Alarm System, the Fire Watch may be discontinued ____ minutes after the completion of each work day.
A) 15
B) 30
C) 45
D) 60
B) 30
According to LAFD Training Bulletin No. 94, “Asbestos Abatement – Chapter VIII Fire Suppression”, all existing sprinkler systems shall remain active. Sprinkler heads may be covered with a thin, ___ or less, plastic bag during abatement to avoid their contamination.
A) .003”
B) .002”
C) .005”
D) .006”
A) .003”
According to LAFD Training Bulletin No. 94, “Asbestos Abatement – Chapter XI Signage”, in a multiple story building, a standard 20” X 14” black on ______ asbestos abatement warning sign shall be placed in the _________ adjacent to the fire alarm annunciator panel.
A) White, Fire Control Room
B) Red, HVAC Room
C) Yellow, Fire Control Room
D) Blue, 1st Floor Lobby
C) Yellow, Fire Control Room
According to LAFD Training Bulletin No. 94, “Asbestos Abatement – Chapter XVII Emergency Protective Equipment”, ____ “tyvek” type protective entry suits, rated for use in an asbestos containment area, shall be provided for each containment site. These suits shall be for the exclusive use of emergency personnel.
A) Four
B) Five
C) Nine
D) Ten
B) Five
According to LAFD Training Bulletin No. 107, “Mark I Auto Injectors”, these auto-injectors contain pre-measured amounts of Atropine (___mg) and 2-PAM CI (___ mg) antidotes to be used in instances of exposure to a nerve agent.
A) 1, 300
B) 2, 600
C) 2, 300
D) 3, 400
B) 2, 600
According to LAFD Training Bulletin No. 107, “Mark I Auto Injectors”, when auto- injector use is indicated, hold firmly in place for ____ seconds, remove and massage the area of injection.
A) 2
B) 5
C) 7
D) 10
D) 10