Quantification and Costing Flashcards

1
Q

What are the benefits of using a standard method of measurement?

A

Consistency, accuracy, comprehensively covers everything, familiarity, comparable tender submissions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What standard methods of measurement are you aware of?

A
  • New Rules of Measurement
  • Civil Engineering Standard Method of Measurement
  • Highways Method of Measurement
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What RICS guidance is there on quantification?

A
  • Cost Prediction Professional Statement
  • International Property Measurement Standards
  • Code of Measuring Practice
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How is CESMM4 set out?

A
Elementally breaks down civil engineering projects into 26 classes (A-Z). Some of these include:
Class A - General
Class E - Earthworks
Class R - Roads
Class P - Piling
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How does the Highways Method of Measurement work?

A
Breaks down highways projects elementally into series  including:
100 - Prelims
200 - Site Clearance
500 - Drainage and Service Ducts
700 - Pavements
1100 - Kerbs, Footways and Paved Areas
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Give an example of how you measured something using highways method?

A

Series 700 - Pavements
Sub base measured in m3
Base, Binder and Surface Course in m2

Series 500 Drainage
Filter drain in m, measured on the centre line

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the difference between activity schedule and a schedule of works?

A

Schedule of works is at a higher level than an activity schedule, an activity schedule breaks down the task to be carried out and allocates a price against each.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly