Quantification Flashcards

1
Q

What is POMI

A

Principles of Measurement International
-Published By RICS Business service limited
-For Civil Engineering and Building works
-17 Sections & Appendix
-Section GP General Principal.
-Section A-R

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

CESMM3

A

Civil Engineers Standard Method of Measurements
-Prepared by the Institute of Civil Engineers.
-For Civil Engineering and associated small buildings.
-8 Sections and 26 Classes
-List of principal quantities provided
-Coding systems to BoQ items.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How Preliminaries Measured in POMI & CESEMM3

A

POMI: General Requirement.
CESSEM3: Genaral Items.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How you Measure duct works as POMI

A

Rectangular: By weight + FFisstings to be included ( measured center to center length)
Circular Ovel flexible- BY length, fitting to be measured separately +

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Explain NRM

A

New rules of Mearement as 3 publication
NRM1 - Order of cost estimate
NRM2-Detail measurement of Capital building
NRM3-Maintainance and operation cost estimate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How do you prepare a BOQ?

A

-Understand project parameters
- Gather all the information ( spec/ Dwg)
-Type of procurement.
-Payment mechanism.
-select the method of Measurement.
- Structure the BOQ

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the 4 rules in CESSM3?

A
  1. Definition rule
  2. Measurement
  3. Covarage
  4. Additional description rule.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How To measure Pile

A

-Pile by length ( top to bottom of the pile)
-Boring through rock extra over
- Excavated materials by m3
-Reinforcement under section C by KG.
- Concrete Pouring by m3
- Curring top by number
-Testing Pile by item

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the Structure of POMI BOQ

A
  • Pricing Preamble / Rates and Measurement clauses
    -General Requirements
    -Works (site works/ Concrete / Masonry)
    -Day works
  • PS sum
    -Main summary
How well did you know this?
1
Not at all
2
3
4
5
Perfectly