PVB , SVB & DC Flashcards

1
Q

What is the critical level of a PVB?

A

12 inches above the downstream use

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What can be done if the air inlet of a PVB will not seat?

A

Increase the supply pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Two areas were a PVB shouldn’t be installed?

A

In a pit or area with toxic fumes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How should a PVB be installed?

A

upright & plumb

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A PVB is rated for what type of hazard and backflow?

A

High hazard & low hazard

Backsiphonge only

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the maximum pressure drop across a PVB?

A

10 PSI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the minimum PSID for the check of a PVB?

A

1 PSID

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the minimum PSID that the air inlet valve of a PVB must open out ?

A

1 PSID

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How many test cocks are part of the PVB assembly?

A

Two Test Cocks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Where are the shut off valves located on a PVB assembly?

A

Inlet & Outlet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Can a PVB be subjected to continuous pressure?

A

Yes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The # 1 test cock of a PVB assembly is located where in relationship to the #1 shutoff?

A

Downstream

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The hydraulic purpose of any PVB is to stop a__________.

A

Siphon

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

An indication that a pressure vacuum breaker is undersized for its application is

A

chatter or noise during flow

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

When using the one hose test on a PVB ,how many of the shut off valves must be closed?

A

Both

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Pressure vacuum breaker shut offs and test cocks will avoid freeze damage if winterized by________________

A

rotating the ballvalves handles to a 45 degree angle

17
Q

If not marked , a pressure vacuum breaker’s critical level is

A

the bottom of the valve body

18
Q

What is the most common use for a pressure vacuum breaker?

A

Irrigation system

19
Q

A spill -resistant vacuum breaker’s check valve must be drip tight at ____ PSID.

20
Q

The required minimum number of resilient seated valves in an SVB is

21
Q

The closing & opening pressure of a spill-resistant vacuum breaker’s vent valve is _____PSID

22
Q

An SVB ‘s critical level must be above the downstream use by at least _____ inches?

23
Q

A spill- resistant vacuum breaker assembly has how many test cocks?

A

one test cock

24
Q

The SVB may be subjected to _______ water pressure.

A

continuous

25
The SVB must not be installed in areas containing _____ fumes.
toxic
26
How must the SVB be installed according to the manufacturer?
Upright & Plumb
27
Which valves of the SVB must be closed when performing the one hose test procedure?
Both valves
28
What application was the SVB specifically designed to solve in the plumbing system.
X-ray development lab in a Hospital
29
How many test cocks does a Double check detector assembly have as part as the assembly?
eight
30
What is the minimum PSID of the #one check on a DC?
1 PSID