Pump Operator PRL And BRV Flashcards
Who determines pressure required at the pump?
The branch operator
What are operating principles when pump operator on the PRL
Control the discharge carefully and make any changes gradually
Ensure water supply is maintained constantly
If it necessary to cut water supply for any reason every effort must be made to warn the branch operators before this happens
Watch gauges constantly as this will tell what is happening with regard to supply and delivery
Ensure the tank is full at all times so it is ready for use
Ensure that you know exactly where all your deliveries are working
What is the theoretical lift when pumping from open water?
10m
How many ;eights of hose should there be between pumps in a water relay?
7
How many litres per min can the BRV pump?
511
What is the max operating pressure of the BRV?
22 bar
If the main branch operator does not specify a pressure what should be supplied to start?
3 bar
When pumping from a pressure fed supply on a roadway what additional PPE should be worn?
Hi-viz and ear plugs
When pumping at a high rise incident for every meter the branch is above the pump what additional bar should be added?
0.1 bar
Hoe many kilometres of hose are there in the HVPU?
3km
What is CREFT?
Creating the flow
Raising the water
Entry loss
Frictional resistance
Temperature
What hose should be used to connect a pump to a standpipe when implement a pressure fed supply?
70mm