PTV 13 Flashcards
DAILY CALL SHEETS
Basic information for each day of shooting
Outlines when and where workers are required
and the producer’s team
When is a daily call sheet created?
Created after the shooting schedule is finishe
who creases a daily call sheet?
the Assistant Directo
DAILY PRODUCTION REPORT
Summary of what happens each day of production
who creates DAILY PRODUCTION REPORT
the Producer’s team
PRODUCTION/STUDIO CONTROL ROOM
composition of the outgoing programme takes place
where the director controls the production
coordinating
MASTER CONTROL ROOM
Where the on-air signal is controlled
monitoring quality and accuracy of the on-air product before being transmitted
TRANSMISSION CONTROL ROOM
scaled-down version of a MCR to manage only two TV channels