PTI Flashcards
How many seconds between final safety check and closing doors
2 seconds
Drivers responsibilities x 4
1 safe & punctual working
2 train dispatch
3 door operations
4 passenger announcements
Behaviour to be aware of x 4
Running towards the train and along the platform edge
Standing to close
Banging on windows and doors
Bikes , skateboards , roller skates
Duty of care dvsty
Dispatch safely
Vulnerable passengers
STOP if unsafe
Drivers responsibility (DOO)
Arrival and departure
Station duties are carried out
Safe and punctual working
Rule 4
Closing doors without platform staff
1 check for proceed aspect
2 allow time to get on and off
3 cctv + safety check
4 watch for vulnerable people
5 close doors
6 check for interlock light
7 cctv and safety check
8 check for proceed aspect
9 STOP if any doubt
10 opposite side door safety check and usage if needed
Train safety check
Train doors are properly closed
Nothing and nobody caught in the doors
Nobody in contact with train
Make sure it is safe to start the journey
Securing the train
Brake step 3
Dra is set and lit
DDS is in neutral
Door closure procedure
using CCTV x 3
Train safety check
Check CCTV monitors from front to back using a Z formation
Inspect all doors and platform edge for passenger safety
Rule 6
Train dispatch with no CCTV or platform staff
1 inform signaller of extra time needed
2 safety check
3 if leaving cab , secure and take key
4 walk down the whole train
5 close each set of coach doors manually with carriage key
6 return to cab , close cab door , re-energise cab , DRA , check for interlock
7 secure cab
8 re walk the whole train making sure all doors are closed
9 Return to cab, close doors , re-energise , check for interlock
10 check you have a proceed aspect before moving
Wrong side door release
1 close doors straight away and re open on the correct side
2 contact signaller immediately
3 ask for emergency switch off and line blocked
4 secure the cab and do a physical check along the whole of the train , get help from platform staff or conductor , once satisfied all is clear contact signaller to remove line block and restore power
5 work to instructions given by signaller