PSM1 P3 Flashcards

1
Q

Who is accountable for clearly expressing Product Backlog items? (Choose the best answer.)
A . The business analyst who represents the Product Owner.
B . The Product Owner.
C . The Scrum Master, or the Scrum Master may have the Developers do it.
D . The Scrum Master.

A

B . The Product Owner.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

For the purpose of transparency, when does Scrum say a new increment of working software must be available?
A . After the acceptance testing phase.
B . Before the release Sprint.
C . Every 3 Sprints.
D . At the end of every Sprint.
E . When the Product Owner asks to create one.

A

D . At the end of every Sprint.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How much time is required after a Sprint to prepare for the next Sprint?
A . The break between Sprints is time-boxed to 1 week for 30 day Sprints, and usually less for shorter sprints.
B . Enough time for the requirements for the next Sprint to be determined and documented.
C . Enough time for the Development team to finish the testing from the last Sprint.
D . None. A new Sprint starts immediately following the end of the previous Sprint.
E . All of the above are allowed depending on the situation.

A

D . None. A new Sprint starts immediately following the end of the previous Sprint.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Which of the following services are appropriate for a Scrum Master in regard to the Daily Scrum?
A . Lead the discussions of the Development Team.
B . Make sure that all 3 questions have been answered by each member of the team.
C . Keep track of whether each team member has a chance to speak.
D . Teach the Development Team to keep the Daily Scrum within the 15 minute time-box.
E . All of the above.

A

D . Teach the Development Team to keep the Daily Scrum within the 15 minute time-box.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When many Scrum Teams are working on a single product, what best describes the Definition of Done?

(Choose the best answer.)
A . Each Scrum Team defines and uses its own. The differences are discussed and reconciled during a
hardening Sprint.
B . The Scrum Masters from each Scrum Team define a common Definition of Done.
C . Each Scrum Team uses its own, but must make their definition clear to all other teams so the differences are known.
D . All Scrum Teams must have a Definition of Done that makes their combined work potentially releasable.

A

D . All Scrum Teams must have a Definition of Done that makes their combined work potentially releasable.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Which two ways of creating Development Teams are consistent with Scrum’s values? (Choose two.)
A . Existing teams propose how they would like to go about organizing into the new structure.
B . Managers personally re-assign current subordinates to new teams.
C . Managers collaborate to assign individuals to specific teams.
D . Bring all the developers together and let them self-organize into Development Teams.
E . The Chief Product Owner determines the new team structures and assignments.

A

A . Existing teams propose how they would like to go about organizing into the new structure.
D . Bring all the developers together and let them self-organize into Development Teams.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Who is responsible for clearly expressing Product Backlog items?
A . The Scrum Master, or the Scrum Master may have the Development Team do it.
B . The Scrum Master.
C . The Product Owner.
D . The business analyst who represents the Product Owner in the Development Team.

A

C . The Product Owner.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
Who determines when it is appropriate to update the Sprint Backlog during a Sprint?
A . The Project Manager.
B . The Development Team.
C . The Scrum Team.
D . The Product Owner.
A

B . The Development Team.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What techniques could the Scrum Master use when the Scrum Team gets caught in an internal disagreement about which agile practices to apply? (Choose the best two answers.)
A . Involve the complete Scrum Team in making a decision.
B . Use coaching techniques; such as open QUESTION NO:s and active listening.
C . Ask an external agile coach what they recommend.
D . Ask team members to take the issue up with to the company’s Human Resources department.

A

A . Involve the complete Scrum Team in making a decision.

B . Use coaching techniques; such as open QUESTION NO:s and active listening.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How much work must a Development Team do to a Product Backlog item it selects for a Sprint?
A . A proportional amount of time on analysis, design, programming, testing, and documentation.
B . As much as it can fit into the Sprint. Any remaining work will be transferred to a subsequent Sprint.
C . All development work and at least some testing.
D . As much as it has told the Product Owner will be done for every Product Backlog item it selects in conformance with the definition of “Done”.

A

D . As much as it has told the Product Owner will be done for every Product Backlog item it selects in conformance with the definition of “Done”.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
Who is accountable for tracking the remaining work toward the Sprint Goal? (Choose the best answer.)
A . The Developers.
B . The Scrum Master.
C . The Product Owner.
D . The Project Manager.
A

A . The Developers.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When is implementation of a Product Backlog item considered complete?
A . At the end of the Sprint.
B . When the item has no work remaining in order to be potentially released.
C . When QA reports that the item passes all acceptance criteria.
D . When all work in the Sprint Backlog related to the item is finished.

A

B . When the item has no work remaining in order to be potentially released.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
Which Scrum Values are exhibited by not building Product Backlog items that have low business value? (Choose three.)
A . Economic Value Added.
B . Respect.
C . Focus.
D . Earned Value.
E . Courage.
A

B . Respect.
C . Focus.
E . Courage.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Which statement best describes the Sprint Backlog as outcome of the Sprint Planning?
A . It is a complete list of all work to be done in a Sprint.
B . Every item has a designated owner.
C . Each task is estimated in hours.
D . It is the Development Team’s plan for the Sprint.
E . It is ordered by the Product Owner.

A

A . It is a complete list of all work to be done in a Sprint.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

A Scrum Master is introducing Scrum to a new Development Team. The Development Team gas decided that a Sprint Retrospective is unnecessary.

What action should the Scrum Master take?
A . Call a meeting between the Development Team and senior management.
B . Comply with the decision of the self-organizing team.
C . Consult with the Product Owner to see how he/she feels about the situation.
D . Begin facilitating productive and useful Sprint Retrospectives.

A

D . Begin facilitating productive and useful Sprint Retrospectives.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

At the seventh Sprint Review, the stakeholders are disappointed and angry. They have determined that the product or system being built will not meet their needs and will cost more than they are willing to spend.

What factors likely led to this? (Choose two.)
A . The Project Management Office (PMO) has not been engaged adequately.
B . The Product Owner has not been keeping the stakeholders aware of the progress of the project.
C . The stakeholders haven’t been using the Sprint Reviews to inspect and evaluate progress.
D . The stakeholders were not allowed to enter the development area.

A

A . The Project Management Office (PMO) has not been engaged adequately.
B . The Product Owner has not been keeping the stakeholders aware of the progress of the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

In accordance with Scrum theory, how should a group of 100 people be divided into multiple Development Teams?
A . Understanding the product, the product vision and the rules of the Scrum framework, the group divides itself into teams.
B . It doesn’t really matter because you can rotate the teams every Sprint to spread knowledge.
C . Check with the allocation department to see who has worked together before and make these the first teams.
D . Create a matrix of skills, seniority, and level of experience to assign people to teams.

A

A . Understanding the product, the product vision and the rules of the Scrum framework, the group divides itself into teams.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q
Which of the following are roles on a Scrum Team? (Choose all that apply.)
A . Users
B . Scrum Master
C . Product Owner
D . Development Team
E . Customers
A

B . Scrum Master
C . Product Owner
D . Development Team

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

A Development Team asks their Product Owner to re-order the Product Backlog. The team is waiting for an external supplier to deliver a specific software component. Without that component there won’t be enough work in the next Sprint to occupy the full team. The Product Owner asks the Scrum Master for help.

What would be good advice to give the Product Owner?
A . Remind the Product Owner that his primary concern is the flow of value reflected in the ordering of the Product Backlog.
B . Tell the Product Owner to re-order the Product Backlog so the work involving the external component can be planned in a separate sprint.
C . Tell the Product Owner that the Product Backlog should be ordered to maximize utilization of the Development Team.

A

A . Remind the Product Owner that his primary concern is the flow of value reflected in the ordering of the Product Backlog.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Which of the following are true about the Product Owner role? (Choose two.)
A . The Product Owner is one person.
B . The Product Owner is accountable for ordering the Product Backlog.
C . Multiple people can share the Product Owner role on a Scrum Team.
D . The Product Owner role can be played by a committee or a team of people.

A

A . The Product Owner is one person.

B . The Product Owner is accountable for ordering the Product Backlog.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Scrum has a role called “Project Manager”.
A . True
B . False

A

B . False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

How should a Development Team deal with non-functional requirements?
A . Ensure every Increment meets them.
B . Make sure the release department understands these requirements, but it is not the Development Team’s responsibility.
C . Handle them during the Integration Sprint preceding the Release Sprint.
D . Assign them to the lead developers on the team.

A

A . Ensure every Increment meets them.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

You are the Scrum Master on a newly formed Scrum Team.

Which three of the following activities would probably help the team in starting up? (Choose three.)
A . Introduce a bonus system for the top performers in the team.
B . Have the Scrum Team members introduce themselves to each other and give a brief background of their skills and work history.
C . Have the development managers for each Development Team member introduce their direct reports and go over their responsibilities on the Scrum Team.
D . Ensure the Scrum Team members have compatible personalities.
E . Ensure the team understands they need a definition of “Done”.
F . Ask the Product Owner to discuss the product or project, its history, goals, and context, as well as answer questions.

A

B . Have the Scrum Team members introduce themselves to each other and give a brief background of their skills and work history.
E . Ensure the team understands they need a definition of “Done”.
F . Ask the Product Owner to discuss the product or project, its history, goals, and context, as well as answer questions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Which statement best describes Scrum?
A . A defined and predictive process that confirms to the principles of Scientific Management.
B . A complete methodology that defines how to develop software.
C . A cookbook that defines best practices for software development.
D . A framework within which complex products in complex environments are developed.

A

D . A framework within which complex products in complex environments are developed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

Which of the following is required by Scrum? (Choose all that apply.)
A . Sprint Retrospective.
B . Members must be stand up at the Daily Scrum.
C . Sprint Burndown Chart.
D . Release planning.
E . All of the above.

A

A . Sprint Retrospective.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

Scrum is a methodology that tells in detail how to build software incrementally.
A . True
B . False

A

B . False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

Which phrase best describes a Product Owner?
A . Go-between development team and customers.
B . Value optimizer.
C . Requirements engineer.
D . Team manager.

A

B . Value optimizer.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

Who must attend the Daily Scrum?
A . The Scrum Master and Product Owner.
B . The Development Team.
C . The Development Team and Product Owner.
D . The Scrum Team.
E . The Development Team and Scrum Master.

A

B . The Development Team.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

The CEO asks the Development Team to add a “very important” item to a Sprint that is in progress.

What should the Development Team do?
A . Add the item to the current Sprint and drop an item of equal size.
B . Add the item to the current Sprint without any adjustments.
C . Inform the Product Owner so he/she can work with the CE
E . Add the item to the next Sprint.

A

C . Inform the Product Owner so he/she can work with the CE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

During a Sprint, when is new work or further decomposition of work added to the Sprint Backlog?
A . When the Product Owner identifies new work.
B . As soon as possible after they are identified.
C . When the Scrum Master has time to enter them.
D . During the Daily Scrum after the Development Team approves them.

A

B . As soon as possible after they are identified.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

Which of these may a Development Team deliver at the end of a Sprint?
A . Failing unit tests, to identify acceptance tests for the next Sprint.
B . An increment of software with minor known bugs in it.
C . An increment of working software that is “done”.
D . A single document, if that is what the Scrum Master asked for.

A

C . An increment of working software that is “done”.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

What is the purpose of a Sprint Review?
A . To take time to judge the validity of the project.
B . To inspect the product increment with the stakeholders and collect feedback on next steps.
C . To review the Scrum Team’s activities and processes during the Sprint.
D . To build team sprint.

A

B . To inspect the product increment with the stakeholders and collect feedback on next steps.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

When is a Sprint over?
A . When the Product Owner says it is done.
B . When all Product Backlog items meet their definition of “Done”.
C . When all the tasks are completed.
D . When the time-box expires.

A

D . When the time-box expires.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

How much of the Sprint Backlog must be defined during the Sprint Planning event?
A . Just enough tasks for the Scrum Master to be confident in the Development Team’s understanding of the Sprint.
B . The entire Sprint Backlog must be identified and estimated by the end of the Sprint Planning meeting.
C . Enough so the Development Team can create its best forecast of what is can do, and to start the first several days of the Sprint.
D . Just enough to understand design and architectural implications.

A

B . The entire Sprint Backlog must be identified and estimated by the end of the Sprint Planning meeting.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

The Product Owner must release each Increment to production.
A . When it makes sense.
B . To make sure the Development Team is done every Sprint.
C . Whenever the product is free of defects.
D . Without exception.

A

A . When it makes sense.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q
Which output from Sprint Planning provides the Development Team with a target and overarching direction for the Sprint?
A . The Sprint Backlog.
B . The Sprint Goal
C . The release plan.
D . Sprint Review minutes.
A

A . The Sprint Backlog.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

What does it mean to say that an event has a time-box?
A . The event must happen at a set time.
B . The event must happen by a given time.
C . The event must take at least a minimum amount of time.
D . The event can take no more than a maximum amount of time.

A

D . The event can take no more than a maximum amount of time.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
38
Q

A Development Team asks their Product Owner to re-order the Product Backlog. The team is waiting for an external supplier to deliver a specific software component. Without that component there won’t be enough work in the next Sprint to occupy the full team. The Product Owner asks the Scrum Master for help.

What would be good advice to give the Product Owner?
A . Remind the Product Owner that his primary concern is the flow of value reflected in the ordering of the Product Backlog.
B . Tell the Product Owner to re-order the Product Backlog so the work involving the external component can be planned in a separate sprint.
C . Tell the Product Owner that the Product Backlog should be ordered to maximize utilization of the Development Team.

A

A . Remind the Product Owner that his primary concern is the flow of value reflected in the ordering of the Product Backlog.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
39
Q

How often should Development Team membership change?
A . As needed, while taking into account a short term reduction in productivity.
B . Never, because it reduces productivity.
C . As needed, with no special allowance for changes in productivity.
D . Every Sprint to promote shared learning.

A

A . As needed, while taking into account a short term reduction in productivity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
40
Q

Who creates a Product Backlog Item’s estimate?
A . The Development Team after clarifying requirements with the Product Owner.
B . The Product Owner with input from the Development Team.
C . The most senior people in the organization, including architects and subject matter experts.
D . The Scrum Master.
E . The Development Team, alone.

A

A . The Development Team after clarifying requirements with the Product Owner.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
41
Q

Who creates the definition of “Done”?
A . The Scrum Master as he/she is responsible for the Development Team’s productivity.
B . The Scrum Team, in a collaborative effort where the result is the common denominator of all members’ definition.
C . The Product Owner as he/she is responsible for the product’s success.
D . The development organization (or Development Team if none is available from the development organization).

A

D . The development organization (or Development Team if none is available from the development organization).

42
Q

Which outcome is expected as Scrum Teams mature?
A . They will improve their definition of “Done” to include more stringent criteria.
B . The Sprint Retrospectives will grow to be longer than 4 hours.
C . There is no need for a time-boxed Sprint, since time-boxes are only for new Scrum Teams.
D . Sprint Reviews will no longer be needed.
E . A Scrum Master is no longer needed since they are a mature team now.

A

A . They will improve their definition of “Done” to include more stringent criteria.

43
Q

What is the role of management in Scrum?
A . To facilitate the Scrum Teams with insights and resources that help them improve.
B . To monitor the Development Team’s productivity.
C . To identify and remove people that aren’t working hard enough.
D . To continually monitor staffing levels of the Development Team.

A

A . To facilitate the Scrum Teams with insights and resources that help them improve.

44
Q
Who determines when it is appropriate to update the Sprint Backlog during a Sprint?
A . The Project Manager.
B . The Development Team.
C . The Scrum Team.
D . The Product Owner.
A

B . The Development Team.

45
Q

You have six teams using a traditional method to deliver a product. Your management has asked you to start using Scrum. In the initial project there were separate plans and teams for the layers of a software system, i.e. one for the front-end, one for the middle tier, one for the back-end, and one for the interfaces and services. This resembles what is known as component teams. But you have read that it’s a good idea to have teams organized by feature.

What are the advantages of keeping component teams while starting Scrum?
A . There’s less initial disruption than organizing into new teams. As they start, they will discover what works best, and how to potentially re-organize towards this.
B . Component teams generally have the skills needed to create a working Increment of software that provides business value.
C . Because they have worked together for some time, they are likely able to start producing shippable Increments faster that new feature teams would.
D . There are fewer cross-team dependencies than working in feature teams.

A

A . There’s less initial disruption than organizing into new teams. As they start, they will discover what works best, and how to potentially re-organize towards this.

46
Q

A properly functioning Scrum Team will have at least one Release Sprint and may well have several.
A . True
B . False

A

B . False

47
Q

What two factors are best considered when establishing the Sprint length? (Choose two.)
A . The organization has mandated similar length sprints.
B . The level of uncertainty over the technology to be used.
C . The frequency at which team formation can be changed.
D . The risk of being disconnected from the stakeholders.

A

B . The level of uncertainty over the technology to be used.

D . The risk of being disconnected from the stakeholders.

48
Q

When do Development Team members take ownership of a Sprint Backlog item?
A . At the Sprint planning meeting.
B . During the Daily Scrum.
C . Never. All Sprint Backlog Items are “owned” by the entire Development Team, even though each one may be done by an individual Development Team member.
D . Whenever a team member can accommodate more work.

A

C . Never. All Sprint Backlog Items are “owned” by the entire Development Team, even though each one may be done by an individual Development Team member.

49
Q

Select two ways in which technical debt impacts transparency. (Choose two.)
A . When calculated and estimated, the total amount of technical debt shows exactly how long until the Product Owner can release the Increment.
B . It leads to false assumptions about the current state of the system, specifically of an Increment being releasable at the end of a Sprint.
C . As development progresses and code is added, the system becomes more difficult to stabilize, which results in future work being slowed down in unpredictable ways.
D . It enhances transparency for the Product Owner as a Development Team is not allowed to do additional feature development in a Sprint as long as there is technical debt.

A

B . It leads to false assumptions about the current state of the system, specifically of an Increment being releasable at the end of a Sprint.
C . As development progresses and code is added, the system becomes more difficult to stabilize, which results in future work being slowed down in unpredictable ways.

50
Q

Marian is the Product Owner envisioning a project for a new release of her product. She made a projection of a release date based upon a sustained velocity of 17 completed units of work per Sprint. Over the first 3 Sprints, the average velocity was 13 for work that the Development Team estimated as 90% done. The Development Teams, feeling the need to meet the plan, figured that a velocity of 17 was within their reach.

A good way to continue is:
A . The Development Team makes sure that all of the selected scope per Sprint is as “Done” as possible. The undone work is estimated and added to the Sprint Backlog of the next Sprint, so it doesn’t mess up the Product Backlog.
B . Add enough people to the Development Team for the deadline to be made.
C . The opportunity to inspect and adapt is lost. Opaqueness has replaced transparency. Predictability has dropped below zero. The produced software is not usable. As the rules of Scrum have not been respected, it is the Scrum Master’s duty to assess whether repair is possible, or a restart with a more reliable team. If not, the Scrum Master should cancel the project.
D . The Development Team should remind Marian to find funding for enough Release Sprints in which the remaining work can be done.

A

A . The Development Team makes sure that all of the selected scope per Sprint is as “Done” as possible. The undone work is estimated and added to the Sprint Backlog of the next Sprint, so it doesn’t mess up the Product Backlog.

51
Q
Which Scrum Values are exhibited by not building Product Backlog items that have low business value? (Choose three.)
A . Economic Value Added.
B . Respect.
C . Focus.
D . Earned Value.
E . Courage.
A

B . Respect.
C . Focus.
E . Courage.

52
Q

What it the main reason for the Scrum Master to be at the Daily Scrum?
A . To gather status and progress information to report to management.
B . To write down any changes to the Sprint Backlog, including adding new items, and tracking progress on the burn-down.
C . He or she does not have to be there; he or she only has to ensure the Development Team has a Daily Scrum.
D . To make sure every team member answers the three questions.

A

C . He or she does not have to be there; he or she only has to ensure the Development Team has a Daily Scrum.

53
Q

Which answer best describes the topics covered in Sprint Planning?
A . What to do and who will do it.
B . How conditions have changed and how the Product Backlog should evolve.
C . What can be done and how to do it.
D . What went wrong in the last Sprint and what to do differently this Sprint.
E . Who is on the team and what team member roles will be.

A

C . What can be done and how to do it.

54
Q

What is the key concern when multiple Development Teams are working from the same Product Backlog?
A . Minimizing dependencies between teams.
B . Clear definition of requirements.
C . Meeting original scope projections.
D . Making sure there’s enough work for everyone on every team.
E . Maximizing velocity.

A

A . Minimizing dependencies between teams.

55
Q

For which is the Scrum Master responsible?
A . Managing the performance of the Scrum Team.
B . The meetings and the objectives that a Scrum Team sets for itself.
C . The Scrum framework being adopted and used properly.
D . Keeping track of resource allocation.

A

C . The Scrum framework being adopted and used properly.

56
Q

What are two good ways for the Development Team to make non-functional requirements visible? (Choose two.)
A . Put them on a separate list on the Scrum board, available for all to see.
B . Add them to the Product Backlog and keep the Product Owner posted on the expected effort.
C . Run the integration and regression tests before the end of the Sprint, and capture the open work for the Sprint Backlog of the next Sprint.
D . Add them to the definition of “Done” so the work is taken care of every Sprint.

A

B . Add them to the Product Backlog and keep the Product Owner posted on the expected effort.
D . Add them to the definition of “Done” so the work is taken care of every Sprint.

57
Q

A Development Team is required to deliver a done Increment by the end of a Sprint. Select two statements that explain what “Done” means. (Choose two.)
A . All work the Development Team is willing to do.
B . Ready for integration.
C . No work left from the definition of “Done”.
D . Whatever the Product Owner defines as quality.
E . All work to create software that is ready to be released to end users.

A

C . No work left from the definition of “Done”.

E . All work to create software that is ready to be released to end users.

58
Q

19 January 2021examsLeave a commentPost navigation
The time-box for a Daily Scrum?
A . Two minutes per person.
B . 15 minutes.
C . 15 minutes for a 4 week sprint. For shorter Sprints it is usually shorter.
D . 4 hours.
E . The same time of day every day.

A

B . 15 minutes.

59
Q

How should Product Backlog items be chosen when multiple Scrum Teams work from the same Product Backlog?
A . The Scrum Team with the highest velocity pulls Product Backlog items first.
B . The Development Teams pull in work in agreement with the Product Owner.
C . The Product Owner should provide each team with its own Product Backlog.
D . Each Scrum Team takes an equal numbers of items.
E . The Product Owner decides.

A

B . The Development Teams pull in work in agreement with the Product Owner.

60
Q

The length of a Sprint should be:
A . Short enough to keep the business risk acceptable to the Product Owner.
B . Short enough to be able to synchronize the development work with other business events.
C . No more than one calendar month.
D . All of these answers are correct.

A

D . All of these answers are correct.

61
Q

The Daily Scrum is an event that happens every day.

What would be three key concerns if the frequency were to be lowered to every two or three days? (Choose three.)

A. The Scrum Master loses the ability to update the Gantt Chart properly.
B. The Sprint Plan may become inaccurate.
C. Too much work is spent updating the Scrum board before the meeting.
D. The Product Owner cannot accurately report progress to the stakeholders.
E. Impediments are raised and resolved more slowly.
F. Opportunities to inspect and adapt the Sprint Backlog are lost.

A

B. The Sprint Plan may become inaccurate.
E. Impediments are raised and resolved more slowly.
F. Opportunities to inspect and adapt the Sprint Backlog are lost.

62
Q

Which of the following are true about the length of the Sprint? (Choose two.)
A . The length of the Sprint should be proportional to the work that is done in between Sprints.
B . It is best to have Sprints of consistent length throughout a development effort.
C . Sprint length is determined during Sprint Planning, and should hold the time it will take to code the planned features in the upcoming Sprint, but does not include time for any testing.
D . Sprint length is determined during Sprint Planning, and should be long enough to make sure the Development Team can deliver what is to be accomplished in the upcoming Sprint.
E . All Sprints must be 1 month or less.

A

B . It is best to have Sprints of consistent length throughout a development effort.
E . All Sprints must be 1 month or less.

63
Q

Which two things should the Development Team do during the first Sprint? (Choose two.)
A . Make up a plan for the rest of the project.
B . Analyze, describe, and document the requirements for the subsequent Sprints.
C . Develop at least one piece of functionality.
D . Analyze, design, and describe the complete architecture and infrastructure.
E . Create an increment of potentially releasable software.

A

C . Develop at least one piece of functionality.

E . Create an increment of potentially releasable software.

64
Q

In the Sprint Planning meeting, the Product Owner and the Development Team were unable to reach a clear understanding about the highest order Product Backlog items. Because of this, the Development Team couldn’t figure out how many Product Backlog items it could forecast for the upcoming Sprint. They were able to agree on a Sprint Goal, however.

Which of the following two actions should the Scrum Master support? (Choose two.)
A . Cancel the Sprint. Send the entire team to an advanced Scrum training and then start a new Sprint.
B . Forecast the most likely Product Backlog items to meet the goal and create a Sprint Backlog based on a likely initial design and plan. Once the time-box for the Sprint Planning meeting is over, start the Sprint and continue to analyze, decompose, and create additional functionality during the Sprint.
C . Continue the Sprint Planning meeting past its time-box until an adequate number of Product Backlog items are well enough understood for the Development Team to make a complete forecast. Then start the Sprint.
D . Discuss in the upcoming Sprint Retrospective why this happened and what changes will make it less likely to recur.
E . Ask everyone to take as much time as needed to analyze the Product Backlog first, and then reconvene another Sprint Planning meeting.

A

B . Forecast the most likely Product Backlog items to meet the goal and create a Sprint Backlog based on a likely initial design and plan. Once the time-box for the Sprint Planning meeting is over, start the Sprint and continue to analyze, decompose, and create additional functionality during the Sprint.
D . Discuss in the upcoming Sprint Retrospective why this happened and what changes will make it less likely to recur.

65
Q

A Development Team selects a set of Product Backlog items for a Sprint Backlog with the intent to get the selected items “Done” by the end of the Sprint.

Which three phrases best describe the purpose of a definition of “Done”? (Choose three.)
A . It controls whether the developers have performed their tasks.
B . It provides a template for elements that need to be included in the technical documentation.
C . It creates transparency over the work inspected at the Sprint Review.
D . It trucks the percent completeness of a Product Backlog item.
E . It guides the Development Team is creating a forecast at the Sprint Planning.
F . It defines what it takes for an Increment to be ready for release.

A

C . It creates transparency over the work inspected at the Sprint Review.
E . It guides the Development Team is creating a forecast at the Sprint Planning.
F . It defines what it takes for an Increment to be ready for release.

66
Q
When is it most appropriate for a Development Team to change the definition of “Done”?
A . During Spring Planning.
B . Prior to starting a new Sprint.
C . During the Sprint Retrospective.
D . Prior to starting a new project.
A

C . During the Sprint Retrospective.

67
Q
Who should make sure everyone on the Development Team does his or her tasks for the Sprint?
A . The Project Manager.
B . The Product Owner.
C . The Scrum Master.
D . The Development Team.
E . All of the above.
A

D . The Development Team.

68
Q

During a Sprint Retrospective, for what is the Product Owner responsible?
A . Participating as a Scrum Team member.
B . Summarizing and reporting the discussions to the stakeholders that he/she represents in the Scrum Team.
C . Capturing requirements for the Product Backlog.
D . The Product Owner should not take part in Sprint Retrospectives.

A

A . Participating as a Scrum Team member.

69
Q

What are three ways Scrum promotes self-organization? (Choose three.)
A . By not allowing documentation.
B . By the Development Team deciding what work to do in a Sprint.
C . By preventing stakeholders from entering the development room.
D . By removing titles for Development Team members.
E . By being a lightweight framework.

A

B . By the Development Team deciding what work to do in a Sprint.
D . By removing titles for Development Team members.
E . By being a lightweight framework.

70
Q

When can a Development Team cancel a Sprint?
A . It can’t. Only Product Owners can cancel Sprints.
B . When functional expectations are not well understood.
C . When the Product Owner is absent too often.
D . When the selected Product Backlog items for the Sprint become unachievable.
E . When a technical dependency cannot be resolved.

A

A . It can’t. Only Product Owners can cancel Sprints.

71
Q

Who starts the Daily Scrum?
A . The person coming in last. This encourages people to be on time and helps to stay within the time-box.
B . Whoever the Development Team decides should start.
C . The person who has the token.
D . The Scrum Master. This ensures that the Development Team has the meeting and stays within the time-box.
E . The person who last broke the build.

A

B . Whoever the Development Team decides should start.

72
Q

As the Sprint Planning meeting progresses, the Development Team sees that the workload is greater than they can handle.

Which two are valid actions? (Choose two.)
A . Recruit additional Development Team members before the work can begin.
B . The Development Team ensures that the Product Owner is aware, starts the Sprint, and monitors progress.
C . Cancel the Sprint.
D . Remove or change selected Product Backlog items.
E . The Development Team works overtime during this Sprint.

A

B . The Development Team ensures that the Product Owner is aware, starts the Sprint, and monitors progress.
D . Remove or change selected Product Backlog items.

73
Q

The purpose of a Sprint is to produce a done Increment of product.
A . True
B . False

A

A . True

74
Q

Currently, your Development Teams are organized to address a single layer only (for example, front end, middle tier, back end, and interfaces).

What are three things to consider when deciding to move away from such component teams toward feature teams? (Choose three.)
A . You cannot do Scrum without feature teams.
B . Productivity may suffer when making this kind of move.
C . Getting support from the business side first helps.
D . Feature teams have less communication overhead.
E . With feature teams, it is easier to calculate the productivity per team.

A

B . Productivity may suffer when making this kind of move.
C . Getting support from the business side first helps.
D . Feature teams have less communication overhead.

75
Q

Which technique is the best way the Scrum Master can ensure that the Development Team communicates effectively with the Product Owner?
A . Monitor communications between them and facilitate direct collaboration.
B . Teach the Development Team to talk in terms of business needs and objectives.
C . Teach the Product Owner about the technologies employed during the Sprints.
D . Act as a go-between for them.

A

A . Monitor communications between them and facilitate direct collaboration.

76
Q

How much time is required after a Sprint to prepare for the next Sprint?
A . The break between Sprints is time-boxed to 1 week for 30 day Sprints, and usually less for shorter sprints.
B . Enough time for the requirements for the next Sprint to be determined and documented.
C . Enough time for the Development team to finish the testing from the last Sprint.
D . None. A new Sprint starts immediately following the end of the previous Sprint.
E . All of the above are allowed depending on the situation.

A

D . None. A new Sprint starts immediately following the end of the previous Sprint.

77
Q
Who is responsible for managing the progress of work during a Sprint?
A . The Scrum Master.
B . The Development Team.
C . The Product Owner.
D . The most junior member of the Team.
A

B . The Development Team.

78
Q

When many Scrum Teams are working on the same product, should all of their increments be integrated every Sprint?
A . Yes, but only for Scrum Teams whose work has dependencies.
B . Yes, otherwise the Product Owners (and stakeholders) may not be able to accurately inspect what is done.
C . No, each Scrum Team stands alone.
D . No, that is far too hard and must be done in a hardening Sprint.

A

B . Yes, otherwise the Product Owners (and stakeholders) may not be able to accurately inspect what is done.

79
Q

What are two responsibilities of testers in a Development Team? (Choose two.)
A . Verifying the work of programmers.
B . Everyone in the Development Team is responsible for quality.
C . Tracking quality metrics.
D . Finding bugs.
E . Scrum has no “tester” role.

A

B . Everyone in the Development Team is responsible for quality.
E . Scrum has no “tester” role.

80
Q

Five new Scrum Teams have been created to build one product. A few of the developers on one of the Development Teams ask the Scrum Master how to coordinate their work with the order teams.

What should the Scrum Master do?
A . Teach the Product Owner to work with the lead developers on ordering Product Backlog in a way to avoid too much technical and development overlap during a Sprint.
B . Teach them that it is their responsibility to work with the other teams to create an integrated Increment.
C . Collect the Sprint tasks from the teams at the end of their Sprint Planning and merge that into a consolidated plan for the entire Sprint.
D . Visit the five teams each day to inspect that their Sprint Backlogs are aligned.

A

B . Teach them that it is their responsibility to work with the other teams to create an integrated Increment.

81
Q

How should a Development Team deal with non-functional requirements?
A . Ensure every Increment meets them.
B . Make sure the release department understands these requirements, but it is not the Development Team’s responsibility.
C . Handle them during the Integration Sprint preceding the Release Sprint.
D . Assign them to the lead developers on the team.

A

A . Ensure every Increment meets them.

82
Q
Which output from Sprint Planning provides the Development Team with a target and overarching direction for the Sprint?
A . The Sprint Backlog.
B . The Sprint Goal
C . The release plan.
D . Sprint Review minutes.
A

B . The Sprint Goal

83
Q

Which two things should the Development Team do during the first Sprint? (Choose two.)
A . Make up a plan for the rest of the project.
B . Analyze, describe, and document the requirements for the subsequent Sprints.
C . Develop at least one piece of functionality.
D . Analyze, design, and describe the complete architecture and infrastructure.
E . Create an increment of potentially releasable software.

A

C . Develop at least one piece of functionality.

E . Create an increment of potentially releasable software.

84
Q
Who should make sure everyone on the Development Team does his or her tasks for the Sprint?
A . The Project Manager.
B . The Product Owner.
C . The Scrum Master.
D . The Development Team.
E . All of the above.
A

D . The Development Team.

85
Q

Which of these may a Development Team deliver at the end of a Sprint?
A . Failing unit tests, to identify acceptance tests for the next Sprint.
B . An increment of software with minor known bugs in it.
C . An increment of working software that is “done”.
D . A single document, if that is what the Scrum Master asked for.

A

C . An increment of working software that is “done”.

86
Q

What does it mean to say that an event has a time-box?
A . The event must happen at a set time.
B . The event must happen by a given time.
C . The event must take at least a minimum amount of time.
D . The event can take no more than a maximum amount of time.

A

D . The event can take no more than a maximum amount of time.

87
Q

When is a Sprint over?
A . When the Product Owner says it is done.
B . When all Product Backlog items meet their definition of “Done”.
C . When all the tasks are completed.
D . When the time-box expires.

A

D . When the time-box expires.

88
Q

Which of the following is required by Scrum? (Choose all that apply.)
A . Sprint Retrospective.
B . Members must be stand up at the Daily Scrum.
C . Sprint Burndown Chart.
D . Release planning.
E . All of the above.

A

A . Sprint Retrospective.

89
Q

During a Sprint, when is new work or further decomposition of work added to the Sprint Backlog?
A . When the Product Owner identifies new work.
B . As soon as possible after they are identified.
C . When the Scrum Master has time to enter them.
D . During the Daily Scrum after the Development Team approves them.

A

B . As soon as possible after they are identified.

90
Q

Who starts the Daily Scrum?
A . The person coming in last. This encourages people to be on time and helps to stay within the time-box.
B . Whoever the Development Team decides should start.
C . The person who has the token.
D . The Scrum Master. This ensures that the Development Team has the meeting and stays within the time-box.
E . The person who last broke the build.

A

B . Whoever the Development Team decides should start.

91
Q

A properly functioning Scrum Team will have at least one Release Sprint and may well have several.
A . True
B . False

A

A . True

92
Q

The Daily Scrum is an event that happens every day.

What would be three key concerns if the frequency were to be lowered to every two or three days? (Choose three.)
A . Opportunities to insect and adapt the Sprint Backlog are lost.
B . Impediments are raised and resolved more slowly.
C . The Product Owner cannot accurately report progress to the stakeholders.
D . Too much work is spent updating the Scrum board before the meeting.
E . The Scrum Master loses the ability to update the Gantt chart properly.
F . The Sprint plan may become inaccurate.

A

A . Opportunities to insect and adapt the Sprint Backlog are lost.
B . Impediments are raised and resolved more slowly.
F . The Sprint plan may become inaccurate.

93
Q

How much time is required after a Sprint to prepare for the next Sprint?
A . The break between Sprints is time-boxed to 1 week for 30 day Sprints, and usually less for shorter sprints.
B . Enough time for the requirements for the next Sprint to be determined and documented.
C . Enough time for the Development team to finish the testing from the last Sprint.
D . None. A new Sprint starts immediately following the end of the previous Sprint.
E . All of the above are allowed depending on the situation

A

D . None. A new Sprint starts immediately following the end of the previous Sprint.

94
Q

Who creates a Product Backlog Item’s estimate?
A . The Development Team after clarifying requirements with the Product Owner.
B . The Product Owner with input from the Development Team.
C . The most senior people in the organization, including architects and subject matter experts.
D . The Scrum Master.
E . The Development Team, alone.

A

A . The Development Team after clarifying requirements with the Product Owner.

95
Q

n the Sprint Planning meeting, the Product Owner and the Development Team were unable to reach a clear understanding about the highest order Product Backlog items. Because of this, the Development Team couldn’t figure out how many Product Backlog items it could forecast for the upcoming Sprint. They were able to agree on a Sprint Goal, however.

Which of the following two actions should the Scrum Master support? (Choose two.)
A . Cancel the Sprint. Send the entire team to an advanced Scrum training and then start a new Sprint.
B . Forecast the most likely Product Backlog items to meet the goal and create a Sprint Backlog based on a likely initial design and plan. Once the time-box for the Sprint Planning meeting is over, start the Sprint and continue to analyze, decompose, and create additional functionality during the Sprint.
C . Continue the Sprint Planning meeting past its time-box until an adequate number of Product Backlog items are well enough understood for the Development Team to make a complete forecast. Then start the Sprint.
D . Discuss in the upcoming Sprint Retrospective why this happened and what changes will make it less likely to recur.
E . Ask everyone to take as much time as needed to analyze the Product Backlog first, and then reconvene another Sprint Planning meeting.

A

B . Forecast the most likely Product Backlog items to meet the goal and create a Sprint Backlog based on a likely initial design and plan. Once the time-box for the Sprint Planning meeting is over, start the Sprint and continue to analyze, decompose, and create additional functionality during the Sprint.
D . Discuss in the upcoming Sprint Retrospective why this happened and what changes will make it less likely to recur.

96
Q

How much of the Sprint Backlog must be defined during the Sprint Planning event?
A . Just enough tasks for the Scrum Master to be confident in the Development Team’s understanding of the Sprint.
B . The entire Sprint Backlog must be identified and estimated by the end of the Sprint Planning meeting.
C . Enough so the Development Team can create its best forecast of what is can do, and to start the first several days of the Sprint.
D . Just enough to understand design and architectural implications.

A

C . Enough so the Development Team can create its best forecast of what is can do, and to start the first several days of the Sprint.

97
Q

Which answer best describes the topics covered in Sprint Planning?
A . What to do and who will do it.
B . How conditions have changed and how the Product Backlog should evolve.
C . What can be done and how to do it.
D . What went wrong in the last Sprint and what to do differently this Sprint.
E . Who is on the team and what team member roles will be.

A

C . What can be done and how to do it.

98
Q

A Development Team is required to deliver a done Increment by the end of a Sprint. Select two statements that explain what “Done” means. (Choose two.)
A . All work the Development Team is willing to do.
B . Ready for integration.
C . No work left from the definition of “Done”.
D . Whatever the Product Owner defines as quality.
E . All work to create software that is ready to be released to end users.

A

C . No work left from the definition of “Done”.

E . All work to create software that is ready to be released to end users.

99
Q

Which statement best describes Scrum?
A . A defined and predictive process that confirms to the principles of Scientific Management.
B . A complete methodology that defines how to develop software.
C . A cookbook that defines best practices for software development.
D . A framework within which complex products in complex environments are developed.

A

D . A framework within which complex products in complex environments are developed.

100
Q

As the Sprint Planning meeting progresses, the Development Team sees that the workload is greater than they can handle.

Which two are valid actions? (Choose two.)
A . Recruit additional Development Team members before the work can begin.
B . The Development Team ensures that the Product Owner is aware, starts the Sprint, and monitors progress.
C . Cancel the Sprint.
D . Remove or change selected Product Backlog items.
E . The Development Team works overtime during this Sprint.

A

B . The Development Team ensures that the Product Owner is aware, starts the Sprint, and monitors progress.
D . Remove or change selected Product Backlog items.