Project Management Processes Flashcards

1
Q
  • Progression of phases through a series of developmental stages
  • Plan driven or change driven
A

Project Life Cycle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • Predictive development life cycles that require scope, schedule, and cost determination
  • Done before the work begins to product project deliverables
A

Plan-Driven Project Life Cycle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • Use iterative, incremental, or adaptive (agile) development life cycles
  • Varying levels of early planning for scope, schedule, and cost
A

Change-Driven Project Life Cycle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • Combination or predictive and adaptive development life cycles
A

Hybrid Development Life Cycle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  1. Initiating
  2. Planning
  3. Executing
  4. Monitoring and Controlling
  5. Closing
A

Project Management Process Groups

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • Takes place between each phase
  • Involves analyzing the results of the completed phase by comparing the results of the phase with business documents, project charter, and project plan
A

Phase Gate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Project management process phase:

  • Determines whether the business case and the benefits management plan can be achieved
  • High level planning to verify if the project can be completed with given constraints
  • Stakeholders identified
  • Stakeholder analysis performed to assess stakeholder involvement
  • Project charter is signed and approved
A

Initiating Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • Creation of the project management plan
  • How to plan, execute, monitor, and control, and close the project
  • Appropriate amount of detail for the project life cycle and development approach
  • Approval of the project management plan by the sponsor
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Project management process phase:

- Team completes the work

A

Executing Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Project management process phase:

  • Done while the work is being done
  • Collects work results or work performance data
  • Change requests are evaluated in the Perform Integrated Change Control process
A

Monitoring and Controlling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Project management process phase:

  • Confirm work is done based on project requirements
  • Gain final acceptance of the project
  • Gather final lessons learned
  • Index and archive records
A

Closing Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  • Process of continually refining estimates and scope
A

Progressive Elaboration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  • Form of Progressive Elaboration
  • As the project progresses, and more information impacting the work becomes available, plans are elaborated in sufficient detail to accomplish the work
A

Rolling Wave Planning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Project management process phase:

  • Sponsor selects the project manager
  • Identify stakeholders, and determine their influence
  • Create a stakeholder register
A

Initiating Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Project management process phase:

  • Determine high-level requirements, constraints, assumptions, and risks.
  • Determine success criteria and measurable project and product
A

Initiating Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Project management process phase:

  • Use the benefits management plan to understand the benefits that the project is expected to deliver to the business
  • Finalize the project charter
  • Collect historical information
A

Initiating Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Project management process phase:

  • Perform high-level estimating for schedule and budget
  • Develop project documents such as the risk register, stakeholder register, and assumption log
  • Finalize the project charter
A

Initiating Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Project management process phase:

  • Identify inherent or required milestones on the project
  • Obtain approval of the project charter
  • Define the exit criteria of the project
A

Initiating Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Project management process phase:

Develop Project Management Plan

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Project management process phase:

Plan Scope Management

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Project management process phase:

Collect Requirements

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Project management process phase:

Define Scope

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Project management process phase:

Create WBS

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Project management process phase:

Plan Schedule Management

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

Project management process phase:

Define Activities

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

Project management process phase:

Sequence Activities

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

Project management process phase:

Estimate Activity Durations

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

Project management process phase:

Develop Schedule

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

Project management process phase:

Plan Cost Management

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

Project management process phase:

Estimate Costs

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

Project management process phase:

Determine Budget

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

Project management process phase:

Plan Quality Management

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

Project management process phase:

Plan Resource Management

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

Project management process phase:

Estimate Activity Resources

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

Project management process phase:

Plan Communications Management

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q

Project management process phase:

Plan Risk Management

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

Project management process phase:

Identify Risks

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
38
Q

Project management process phase:

Perform Qualitative Risk Analysis

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
39
Q

Project management process phase:

Perform Quantitative Risk Analysis

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
40
Q

Project management process phase:

Plan Risk Responses

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
41
Q

Project management process phase:

Plan Procurement Management

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
42
Q

Project management process phase:

Plan Stakeholder Management

A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
43
Q

Project management process phase:

  • Determine how you will plan the planning, executing, and monitoring and controlling efforts for stakeholders, requirements, scope, schedule, cost, quality, resources, communications, risk, procurement, changes, and configuration, and put that information into the beginnings of management plans.
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
44
Q

Project management process phase:

  • Refine the high-level requirements from project initiating so they are more specific and detailed.
  • Look for additional requirements
  • Use external analysis, reports, or regulations
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
45
Q

Project management process phase:

  • Expand on the assumptions identified in project initiating, looking for new assumptions and documenting these details.
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
46
Q

Project management process phase:

  • Refine the high-level constraints from project initiating so the are more specific and detailed.
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
47
Q

Project management process phase:

  • Create a description of the deliverables, the work required to complete deliverables, and acceptance criteria.
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
48
Q

Project management process phase:

  • Use the project scope statement to gain approval of the final scope from stakeholders
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
49
Q

Project management process phase:

  • Assess what may need to be purchased on the project.
  • Identify pieces of work that may be outside the organization’s abilities to complete
  • Determine if new technology or equipment needs to be purchased to complete the project
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
50
Q

Project management process phase:

  • Select the procurement strategy for each contract
  • Create a draft of the procurement documents for necessary contracts, including bid documents, procurement statements of work, source selection criteria, and contract provisions
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
51
Q

Project management process phase:

  • Determine SMEs
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
52
Q

Project management process phase:

  • Breakdown deliverables into smaller, more manageable pieces (WBS)
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
53
Q

Project management process phase:

  • Create descriptions of each work package in a WBS dictionary so that the work can be understood and produced without gold plating
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
54
Q

Project management process phase:

  • Break down the work packages from the WBS into lists of activities to produce them
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
55
Q

Project management process phase:

  • Create descriptions of each work package in a WBS dictionary so that the work can be understood and produced without gold plating
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
56
Q

Project management process phase:

  • Break down the work packages from the WBS into lists of activities to product them
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
57
Q

Project management process phase:

  • Sequence activities and determine predecessors and successors in the network diagram
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
58
Q

Project management process phase:

  • Estimate resource requirements
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
59
Q

Project management process phase:

  • Meet with managers to gain resource commitments
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
60
Q

Project management process phase:

  • Decide what level of accuracy is needed for estimates.
A

Planning Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
61
Q

Project management process phase:

  • Use historical data to support estimating time and cost
A

Planning Phase

62
Q

Project management process phase:

  • Involve experts or those who will work on activities to estimate time and cost.
A

Planning Phase

63
Q

Project management process phase:

  • Determine how long the project will take without compressing the schedule (determine critical path)
A

Planning Phase

64
Q

Project management process phase:

  • Develop a schedule model, evaluate it against the schedule constraint in the project charter, and use schedule compression techniques to reconcile the two to come up with a final schedule for the project management plan.
A

Planning Phase

65
Q

Project management process phase:

  • Develop a preliminary budget and compare it to the budget constraint in the project charter. Then, develop options to reconcile the two to come up with the final budget for the project management plan.
A

Planning Phase

66
Q

Project management process phase:

  • Determine quality policies, practices, and standards, and then determine metrics to measure quality performance.
A

Planning Phase

67
Q

Project management process phase:

  • Determine processes to fulfill quality requirements and conform to organizational standards and policies.
A

Planning Phase

68
Q

Project management process phase:

  • Determine how you will improve the processes in use on the project.
A

Planning Phase

69
Q

Project management process phase:

  • Create a system for recognizing and rewarding the efforts of project team members to help keep them motivated and engaged in project details.
A

Planning Phase

70
Q

Project management process phase:

  • Plan for acquisition, team building, training, assessment, and release of team members. Plan for physical resources requirements, including acquisition and logistics.
A

Planning Phase

71
Q

Project management process phase:

  • Determine all roles and responsibilities so team members and stakeholders know their role on the project and what work they will need to do.
A

Planning Phase

72
Q

Project management process phase:

  • Work with project team to develop a team charter defining their commitments and interactions with each other, including ground riles for meetings, conflict resolution processes, etc.
A

Planning Phase

73
Q

Project management process phase:

  • Determine what information you need from other projects and what information you will share with the organization and other projects
A

Planning Phase

74
Q

Project management process phase:

  • Plan what will be communicated on the project, to whom, by whom, when, and how
A

Planning Phase

75
Q

Project management process phase:

  • Plan how to involve stakeholders and manage their expectations during the project
A

Planning Phase

76
Q

Project management process phase:

  • Complete detailed risk identification, subjectively analyze risks, perform quantitative risk analysis as necessary, and do risk response planning
A

Planning Phase

77
Q

Project management process phase:

  • Iterations - go back and update project plans as necessary
A

Planning Phase

78
Q

Project management process phase:

  • Finalize the procurement statement of work and other bid documents for each contract
A

Planning Phase

79
Q

Project management process phase:

  • Look for potential and positive and negative interactions with other projects that could affect the project
A

Planning Phase

80
Q

Project management process phase:

  • Determine the processes that will be used to request, approve, and manage changes on the project
A

Planning Phase

81
Q

Project management process phase:

  • Develop the configuration management plan, outlining naming conventions and processes for document versioning, storage, and retrieval
A

Planning Phase

82
Q

Project management process phase:

  • Plan ways to measure project performance, including determining the measurements to be used. when they will be taken, and how the results will be evaluated
A

Planning Phase

83
Q

Project management process phase:

  • Determine what meetings, reports, and other activities you will use to control the project to the project management plan
A

Planning Phase

84
Q

Project management process phase:

  • Finalize the “execute” and monitor and control” aspects of all management plans.
  • Document closing requirements and actions.
A

Planning Phase

85
Q

Project management process phase:

  • Develop the final project management plan, project documents and performance measurement baseline by performing schedule network analysis, looking for options, and confirming that project objectives can be met.
A

Planning Phase

86
Q

Project management process phase:

  • Gain formal approval of the project management plan from the sponsor, team, and managers of resources
A

Planning Phase

87
Q

Project management process phase:

  • Hold a kickoff meeting with key stakeholders, team members, managers of team members, and the customer to make sure everyone is on the same page and to gain buy-in
A

Planning Phase

88
Q

Project management process phase:

  • Throughout the project, return to the planning processes to do rolling wave planning (progressive elaboration or iteration) as more info becomes available.
A

Planning Phase

89
Q

Project management process phase:

Direct and Manage Project Work

A

Executing Phase

90
Q

Project management process phase:

Manage Project Knowledge

A

Executing Phase

91
Q

Project management process phase:

Manage Quality

A

Executing Phase

92
Q

Project management process phase:

Acquire Resources

A

Executing Phase

93
Q

Project management process phase:

Develop Team

A

Executing Phase

94
Q

Project management process phase:

Manage Team

A

Executing Phase

95
Q

Project management process phase:

Manage Communications

A

Executing Phase

96
Q

Project management process phase:

Implement Risk Responses

A

Executing Phase

97
Q

Project management process phase:

Conduct Procurements

A

Executing Phase

98
Q

Project management process phase:

Manage Stakeholder Engagement

A

Executing Phase

99
Q

Project management process phase:

Communicate expectations for stakeholders and the project and manage the involvement and needs of all stakeholders throughout the project to ensure everyone has a common understanding of the work.

A

Executing Phase

100
Q

Project management process phase:

Implement the most up to date version of the project management plan, including revisions made as a result of control activities

A

Executing Phase

101
Q

Project management process phase:

Complete work packages.

A

Executing Phase

102
Q

Project management process phase:

Collect, document, and share lessons learned.

A

Executing Phase

103
Q

Project management process phase:

Establish and manage communication channels.

A

Executing Phase

104
Q

Project management process phase:

Evaluate how effectively the team members function as a team.

A

Executing Phase

105
Q

Project management process phase:

Implement approved changes, including corrective actions, preventative actions, and defect repair.

A

Executing Phase

106
Q

Project management process phase:

Confirm that practices and procedures are being followed and are still appropriate for the project

A

Executing Phase

107
Q

Project management process phase:

Produce and distribute reports on project performance.

A

Executing Phase

108
Q

Project management process phase:

Hold team building activities.

A

Executing Phase

109
Q

Project management process phase:

Use the team charter for guidance on team interactions. Follow ground rules at team meetings.

A

Executing Phase

110
Q

Project management process phase:

Obtain needed training for team members.

A

Executing Phase

111
Q

Project management process phase:

Exchange info about the project according to the plan and solicit feedback to ensure comm needs are being met.

A

Executing Phase

112
Q

Project management process phase:

Remove roadblocks

A

Executing Phase

113
Q

Project management process phase:

Achieve work results that meet requirements

A

Executing Phase

114
Q

Project management process phase:

Meet w/ managers to reconfirm resource commitments.

A

Executing Phase

115
Q

Project management process phase:

Keep managers apprised of when their resources will be needed on the project.

A

Executing Phase

116
Q

Project management process phase:

Commit, manage, and release physical and team resources in accordance with the project management plan.

A

Executing Phase

117
Q

Project management process phase:

Guide, assist, facilitate, negotiate, and coach.

A

Executing Phase

118
Q

Project management process phase:

Hold meetings to identify and address issues, assess risks, and keep the project work moving forward.

A

Executing Phase

119
Q

Project management process phase:

Manage stakeholder engagement and expectations, increase project support, and prevent problems.

A

Executing Phase

120
Q

Project management process phase:

Focus on preventing problems rather than just dealing with them as they arise.

A

Executing Phase

121
Q

Project management process phase:

Make sure all team members have the skills, info, and equipment needed.

A

Executing Phase

122
Q

Project management process phase:

Look for exceptions to the approved project management plan in team members’ performance, rather than checking up on work.

A

Executing Phase

123
Q

Project management process phase:

Recommend changes to be evaluated in the Perform Integrated Change Control process.

A

Executing Phase

124
Q

Project management process phase:

Follow org policies, procedures, and processes.

A

Executing Phase

125
Q

Project management process phase:

Increase the effectiveness of processes.

A

Executing Phase

126
Q

Project management process phase:

Make updates to the project plan and project documents.

A

Executing Phase

127
Q

Project management process phase:

Create recommendations for the performing org to increase its effectiveness.

A

Executing Phase

128
Q

Project management process phase:

Ensure continued agreement from the stakeholders to the project management plan.

A

Executing Phase

129
Q

Project management process phase:

Keep everyone focused on completing the project to the project charter and the project management plan.

A

Executing Phase

130
Q

Project management process phase:

Keep the project’s business case and benefits management plan in mind while managing the project, especially when problems occur.

A

Executing Phase

131
Q

Project management process phase:

Solve problems.

A

Executing Phase

132
Q

Project management process phase:

Determine where project changes are coming from and what you can do to eliminate the root cause of the need for change.

A

Executing Phase

133
Q

Project management process phase:

Determine final team members and other resources, and bring them on to the project as needed.

A

Executing Phase

134
Q

Project management process phase:

Recognize and reward the team and individuals for their work and performance on the project.

A

Executing Phase

135
Q

Project management process phase:

Gather initial measurements and details about activities of project work (work performance data).

A

Executing Phase

136
Q

Project management process phase:

Implement approved process improvements.

A

Executing Phase

137
Q

Project management process phase:

Use an issue log to record project issues and details about the resolutions.

A

Executing Phase

138
Q

Project management process phase:

Obtain seller responses to bid documents.

A

Executing Phase

139
Q

Project management process phase:

Review proposals, bids, and quotes; negotiate contract terms with prospective sellers; and manage the evaluation and selection of sellers.

A

Executing Phase

140
Q

Project management process phase:

Manage the integration of sellers’ work and deliverables into the overall work and deliverables of the project; manage conflicts and challenges.

A

Executing Phase

141
Q

Project management process phase:

Expend and manage project funds.

A

Executing Phase

142
Q

Project management process phase:

Facilitate conflict resolution using conflict resolution techniques.

A

Executing Phase

143
Q

Project management process phase:

Assess individual team member performance.

A

Executing Phase

144
Q

Project management process phase:

Update human resource records of team members to reflect new skills acquired while working on the project.

A

Executing Phase

145
Q

Project management process phase:

Carry out contingency plans in response to risk triggers.

A

Executing Phase

146
Q

Project management process phase:

Measure project performance according to the project plan.

A

Monitoring and Controlling

147
Q

Project management process phase:

Measure against the performance measurement baseline.

A

Monitoring and Controlling

148
Q

Project management process phase:

Analyze and evaluate work performance data.

A

Monitoring and Controlling

149
Q

Project management process phase:

Determine variances.

A

Monitoring and Controlling

150
Q

Project management process phase:

Use your judgement to determine what variances are important and if they warrant recommending a change or corrective data.

A

Monitoring and Controlling

151
Q

Project management process phase:

Recommend changes, including defect repair and preventative and corrective actions.

A

Monitoring and Controlling