Programming Analysis Flashcards
Cleaning Non/halogenated VOCS (5)
- Soil Vapor Extraction
- Soil Flushing
- Bioremediation
- Bioventing
- Thermal Treatment
Cleaning Fuels (4)
- Soil Vapor Extraction
- Bioremediation
- Bioventing
- Thermal Treatment
Cleaning Inorganics (3)
- Solidification.Stabilization
- Sol Flushing
- Electrokinetic Separation
Cleaning Radionuclides (1)
- Solidification/Stabilization
Cleaning Explosives (1)
- Bioremediation
When to use Soil Solidification/Stabilization
Inorganic, radioactive pollutants (ie. toxic heavy metals, pesticides, fertilizers)
Soil Remediation hierarchy - from cheapest to most expensive
- Do nothing
- Admin Institutional controls
- Engineering controls
- On-site remedial Action
- Off-site disposal or treatment
Life safety site feature included in international fire code but not IBC
Fire lane req.
How to provide waterproofing? (2)
waterproofing , damp proofing
difference between first-right-of-refusal and right of way
first in line if a property goes up for sale
ADA ramp cross slope
1:48
Max slope ADA ramp
1:12
Max length of ramp and rise
30ft long, 30in high
When do you need landing? (vertical dim)
12 ft
Width of firelane, distance from overhang
20ft wide, 10ft from overhang