HFO to DO changeover procedure?
A
- Carry out the changeover far in advance of entering ECA, as it is time consuming procedure.
Before changeover - - Top up service tank and drain service and settling tanks.
- Start a generator on the new fuel to test it
- Lay out filters for the new fuel in case they need changed quickly
- Change over purifier to the new fuel.
During changeover- - Reduce engine load to 30%
- Heat the new fuel so that it comes up to required temperature
- Start to crack open the crossover valve, and changeover gradually, monitoring viscosity and temperature
- open cooler to maintain viscosity
- shut off fuel line trace heating
- shut off return valves to settling tanks
- check temps on each unit.
2
Q
Boiler start up procedure
A
3
Q
Boiler shutdown procedure
A
4
Q
High voltage isolation procedure
A
- Risk assessment
- Permit to work
- Switching schedule/ checklist
- Start carrying out isolations, take the HV equipment offline and then pull the HV breaker in the switchboard
- install the CME and lock this in place, install locks on other points
- All keys are to be retained in key safe.
- instal local earths/spider
- use HV proving unit, test prove test for dead circuit
- work can commence when all of these steps have been carried out.