HFO to DO changeover procedure?

A
  1. Carry out the changeover far in advance of entering ECA, as it is time consuming procedure.
    Before changeover -
  2. Top up service tank and drain service and settling tanks.
  3. Start a generator on the new fuel to test it
  4. Lay out filters for the new fuel in case they need changed quickly
  5. Change over purifier to the new fuel.
    During changeover-
  6. Reduce engine load to 30%
  7. Heat the new fuel so that it comes up to required temperature
  8. Start to crack open the crossover valve, and changeover gradually, monitoring viscosity and temperature
  9. open cooler to maintain viscosity
  10. shut off fuel line trace heating
  11. shut off return valves to settling tanks
  12. check temps on each unit.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Boiler start up procedure

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Boiler shutdown procedure

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

High voltage isolation procedure

A
  1. Risk assessment
  2. Permit to work
  3. Switching schedule/ checklist
  4. Start carrying out isolations, take the HV equipment offline and then pull the HV breaker in the switchboard
  5. install the CME and lock this in place, install locks on other points
  6. All keys are to be retained in key safe.
  7. instal local earths/spider
  8. use HV proving unit, test prove test for dead circuit