Prep for Viva Flashcards
How many types of alternates?
Destination, Enroute, Takeoff
OM A 7.2.1
What is the lowest allowable Takeoff vis?
125 m
OM A 7.4.2
If any below 400, which RVR is controlling?
All
When are all three RVR required?
When vis below 200m
Special requirements for LVTO?
Full thrust, no STOL, extra MEL, TO Alt
What are alternate weather minima required for planning?
ONE APPROACH DA + 400’ VIS + 1500m TWO APPR, DA + 200’ VIS + 800m CAT II CEILING 300’ + RVR 1200 m CAT III CEILING 200’+ RVR 550 m 7.2.4
For pilot without the hours, by how much do you increase the minima?
DA + 100’ VIS + 400m
For alternate forecast: do you count PROB 40 or TEMPO?
Use lowest value.
Minima for Cat I
DH 200, RVR 550-(125-125)
OM A 7.5.7
Minima for Cat 2
DH 100, RVR 300-125 (125)
OM A 7.5.7
Minima for Cat 3A
DH 50, RVR 175-125-125
OM A 7.5.7
Minima for Cat 3B
AH 200, RVR 50-50-50
OM A 5.7
What visual references are required for various approaches?
CAT I : Appr envirom.
CAT II: Appr env. + thr.
CAT IIIA : 3 CL lights
OM A 7.5.7
If you have HI appr lights, what is the CMV factor?
Day: 1.5 Night 2.0
OM A 7.7
For FDTL when is night?
-Home 00:01-08:00
-Away 22:01-06:00
OM A 2.1.1
When is WOCL?
2-6 AM home time for up to 3 times zones away or up to 48 hrs. After 48 hrs, local dept.
What is max daily FTL?
2 pilots: 10hrs, 1 ldg. Night 2 ldg 9hrs.
3 pilots: 12 hrs 1 ldg.
4 pilots: 16 hrs 1 ldg.
OM A 2.2.1
What is max daily FDP 2 pilots?
1 ldg: 13 hrs
2 ldg night: 12.5 hrs
3 ldg day: 12.5 hrs
OM A 2.2.2.2
By how many hrs can you increase FDP with 3 or 4 pilots?
3 p= 4 hrs
4 p= 6 hrs
with bunk
OM A 2.2.2.3
What is the max cumulative Flight time in 7 days? 30 days? 365 days?
7 days= 35 hrs
30 days= 125 hrs
365 days= 1000 hrs
OM A 2.2.2.4
What is the max cumulative Flight Duty in 7 days? 14 days? 28 days?
7 days= 60 hrs
14 days= 100 hrs
28 days= 190 hrs
OM A 2.2.2.5
What are the OM chapters?
A General
B Aircraft operating info
C Route and aerodrome
D Training
How many FIRs are there in India?
1 Mumbai 2 Delhi 3 Chennai 4 Kolkata 5 Guwahati
How many ADIZ zones are there?
N, S, Central, E, W and SE
When is the monsoon season?
West coast: June-Sept
North: Dec-Feb
What do you do after an Airmiss?
-Advise ATC
-File Airmiss report within 7 days.
OM a 34.6
Procedures for refuelling with passengers on board?
-No JET B or JP4
-Two way communication (gnd-cockpit) required
-Seat belts sign OFF
-No smoking sign ON
-Two doors open with stairs or jetways -OR-One door open with stair or jetways + door armed and guarded by cabin crew
OM A 8.4
What are standard passenger weights?
Crew 85 kg
Pax 75 kg
Child 35 kg
Infant 10 kg
What is the advantage of using the CDFA for NPA?
- less cockpit workload
- more efficient/environment friendly
What are the conditions for the Roll out RVR to not be relevant?
- Airport PA max 1000’
- ry length min 9850’
- Auto brake Max
- Full Flap
- Max reverse
- No decel MEL
- Ry not contaminated
- No STOL
- Tailwind max 5 kts
What is max tankering fuel?
30,000kg
What is total fuel required?
Taxi+Trip+Contingency+Alternate+Final Reserve+APU
What are the three stages for low fuel?
- Request delay info
- Declare Min fuel
- Declare Mayday
De Ice procedures & Holdover charts?
OM A 15
When do you ask for a new ADC number?
If delayed by more than 60 min.
What crew documents are required?
Flt LICENCE Radio licence MEDICAL PASSPORT Company ID card Competency Certificate Logbook Last ROUTE check and PPC check
When must seat belts sign be?
During all gnd operations except when refuelling Moderate to severe turbulence During climb up to 10.000’ During descend below 15.000’ 50 nm of DEL
When do you have to wear your harness?
During taxi
Below 10.000’
Turbulence
When only one crew in cockpit
Where are air intercept signals?
Report to ATC
File Air Miss wishing 7 days.
What are Indian airspace classifications?
No A-B-C
D, E, F, G
Characteristics of Class D airspace?
Speed limit always 250 k below FL100*
Two way comm always required for IFR
Terminal areas, control areas, control zones and Aerodrome traffic zones.
Clearance required. IFR to IFR separation, info on VFR.
When is monsoon season?
West coast (Jun – Sep) North India (Dec – Feb)
What are the NOTAM series?
A- Changes to services or facilities, for more than two hours
B- Changes to services or facilities for less than two hours
C- For local airports only
D- Military aerodromes
G- General info
What are the runway width markers?
12 STRIPES = 150’ WIDE
16 STRIPES = 200’ WIDE