Practice test questions Flashcards

1
Q

Which of the following are NOT required to obtain a CCB license?

A licensed Washington contractor working in Oregon temporarily

An individual or business entity performing tree services

A chimney cleaner

An owner who flips two houses a year and contracts with a licensed, residential general contractor to have the work on the houses done

A

An owner who flips two houses a year and contracts with a licensed, residential general contractor to have the work on the houses done

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Two copies of the 1099 must be sent to the independent contractor paid by the contractor by:

A

January 31 of the following year

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

SDS are formerly known as:

A

Both MSDS and Material Safety Data Sheets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Prime contractor complaints are:

General contractor complaints

General contractor complaints against a subcontractor

Subcontractor complaints against a general contractor

Subcontractor complaints

A

General contractor complaints against a subcontractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

One of the most important aspects of project management is:

Accurate and detailed plans and specifications

Ensuring the customer receives a quality-built product

Detailed shop drawings

Value engineering

A

Ensuring the customer receives a quality-built product

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

When workers work in lead, engineering controls include which of the following?

Wearing respirators

Exhaust ventilation through a HEPA vacuum system

Training of workers

Adoption of a respirator program with written standard operating procedures

A

Exhaust ventilation through a HEPA vacuum system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

(TQ008) A painter contracts directly with the owner of a six-story building in downtown Portland to paint the exterior of the structure. They enter into a contract for $235,000. For license endorsement purposes, this is a:

A

Small commercial structure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

If a contractor will install a new Underground Injection Control system, the contractor must provide ___________ days notice to DEQ beforehand:

A

60-90 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

All of the following are common causes of attic leaks EXCEPT:

mproperly installed roofing materials

Missing flashing

Sealed vents

Inadequate surface drainage

A

sealed vents