Practice Quizes Flashcards

1
Q

The Safety Standards utilize the abbreviation 29 CFR Part 1926. What does the acronym CFR stand for?

Code of Federal Register
Code of Federal Regulations
Construction Federal Register
Construction Federal Regulations

A

Code of Federal Regulations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Which part of the OSHA Standards is designated for record keeping?

A) 1910
B)1904
C) 5(a)(1)
D)1926

A

1904

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

According to OSHA, which document must the supervisor complete immediately after an accident by describing the accident in detail?

insurance forms

OSHA’s Summary of Work-Related Injuries and Illnesses (Form 300A)

OSHA’s Log of Work-Related Injuries and Illnesses (Form 300)

OSHA’s Injury and Illness Incident Report (Form 301)

A

OSHA’s Injury and Illness Incident Report (Form 301)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When and where must a project’s OSHA Summary of Work-Related Injuries and Illnesses (Form 300A) be posted?

all year long and easily accessible to all employees at the job site

all year long and in the project tmanager’s office at the home office

February 11–April 30 and accessible to all employees at the job site

for three months and in the employees’ break room at the home office

A

February 11–April 30 and accessible to all employees at the job site for three months and in the employees’ break room at the home office

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

According to OSHA, what is the name of the violation where the firm or designated person is aware that a hazaradous condition exists, knows that the condition violates a standard, and makes no effort to eliminate the safety hazard?

willful violation

serious violation

de minimis violation

other-than-serious violation

A

willful violation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the maximum horizontal travel distance to retrieve a fire extinguisher for a project under construction?

10 ft

25 ft

75 ft

100 ft

A

100 ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Which of the following items are never included with a purchase order?

labor

material

tax

rental equipment

A

Labor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The terms on a purchase order indicateFOB Factory. At which point does the responsibility for the goods change?

passes at the invoice date

passes at the payment due date

passes at time of pickup by the carrier

passes at time of receipt at the job site

A

passes at time of pickup by the carrier

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Which of the following descriptions defines the term 2/10 Net 30?

If paid within 10 days of the arrival of goods, a 2% discount can be deducted; full payment is due in 30 days.

If paid within 10 days of the invoice date, a 2% discount can be deducted; full payment is due in 30 days.

A 2% discount is available for 30 days.

A 2% discount is available through the10th of the month following the receipt of goods; full payment is due in 30 days.

A

If paid within 10 days of the invoice date, a 2% discount can be deducted; full payment is due in 30 days.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which position typically writes the subcontract agreements?

superintendent

project engineer

project manager

planning enginee

A

project manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Which of the following activities does a millwright perform?

cuts and installs trim and cabinets

assembles and aligns rotating equipment

fits and aligns high-pressure process piping

fabricates and assembles sheet metal for ductwork

A

assembles and aligns rotating equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Which party typically obtains the general building permit?

owner

subcontractor

contractor

architect/engineer

A

Concrator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which form is filled out by the employees to inform the employer how much money is to be withheld from their paychecks for taxes?

I-9

W-2

W-4

1099

A

W-4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Which of the following posters describes the regulations for wage payment and hours of work for all industries and must be posted at the job site?

Fair Labor Standards

Prevailing Wage Rates

Material Safety Data Sheet

Safety and Health Protection

A

Fair Labor Standards

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the name of the act that requires the contractor to pay prevailing wage rates on all federally funded projects?

Wagner Act

Taft-Hartley Act

Davis-Bacon Act

Norris-LaGuardia Act

A

Davis-Bacon Act

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Which document is signed in agreement by the owner, architect, and contractor and modifies the contract’s terms and conditions?

addenda

change directive

contract change order

contract change order proposal

A

contract change order

17
Q

Which document establishes the actual start date from which the beginning of the project is calculated?

notice of award

notice to proceed

contractor’s proposal

supplementary conditions

A

notice to proceed

18
Q

Which of the following parties issues the certificate of occupancy?

contractor, architect, and owner

banker, surety, and title company

contractor, mechanical subcontractors, and electrical subcontractor

fire marshal, mechanical inspector, electrical inspector, and building inspector

A

ire marshal, mechanical inspector, electrical inspector, and building inspector

19
Q

Which of the following descriptions provides the best example of how to report progress on the job site?

Poured concrete for the columns.

Installed rebar and poured concrete.

Poured 75 cy concrete, placed rebar, and stripped forms for columns D1–D4.

Poured 75 cy concrete, placed rebar, and stripped forms for the building.

A

Poured 75 cy concrete, placed rebar, and stripped forms for columns D1–D4.

20
Q

Which party is typically the developer of the shop drawings?

owner

architect

construction manager

subcontractors and vendors

A

subcontractors and vendors

21
Q

Which document explicitly tells the reader the specific shop drawings, product data, and reference standards required on a project?

in part 1 of each section of the general requirements

in part 1 of each section of a technical specification division

in part 2 of each section of a technical specification division

at the beginning of the first section of each technical specification division

A

in part 1 of each section of a technical specification division

22
Q

What does the bar support abbreviation CHCU mean?

	Concrete High Chair Upper.
	Continuous High Chair Upper.
	Concrete High Chair Unidentified.
	Continuous High Chair Unidentified.
A

Continuous High Chair Upper.

23
Q

What are the size, and type of bar supports?

Concrete Beam Exhibit.pdf
		2 inch Slab Bolsters.
		2 inch Beam Bolsters.
		5 inch High Chairs.
		5 inch Beam Bolsters.
A

2 inch Slab Bolsters.

24
Q

What is the size of the rebar in inches of the stirrups?

Concrete Beam Exhibit.pdf
		3/8"
		4/6"
		6/8"
		36"
A

3/8”

25
Q

What is the official name of the technical reference source that is mentioned in the documents to Design the Formwork and it is published by ACI?

Formwork Handbook.

Correct Formwork for Concrete.

Formwork Design Manual.

Concrete Formwork Design Manual.

A

Formwork for Concrete.

26
Q

Based upon the pre 2004 version, What CSI Division contains technical information on Drywall?
Selected Answer:

09

06

10

14

A

09

27
Q

What is the official name of the technical reference source that is mentioned in the documents to Place the Slab Bolsters and it is published by CRSI?

Steel Riggers Handbook.

Steel Reinforcement Guide.

Correct Recommended Practice for Placing Bar Supports, Specifications & Nomenclature.

Manual of Steel Erection Practices.

A

Recommended Practice for Placing Bar Supports, Specifications & Nomenclature.

28
Q

Based upon the post 2004 version, Which Division and Section number contains technical information on the communications systems?
Selected Answer:

02780

15950

16500

27000

A

27000

29
Q

Your specifications reference this construction organization Acronym of TIA that publishes numerous Technical Reference Sources. What is the correct name of TIA?

Trade Industry Association.

Testing Industry Association.

Transportation Industry of America.

Correct Telecommunication Industry Association.

A

Telecommunication Industry Association.

30
Q

Based upon the post 2004 version, What CSI Division contains technical information on the Boiler System?

11

13

42

50

A

42

31
Q

Your specifications reference this construction organization Acronym of CRSI that publishes numerous Technical Reference Sources. What is the correct name of CRSI?

Correct Concrete Reinforcing Steel Institute.

Crane and Riggers Specification Institute.

Concrete Reinforcement Standards Institute

Concrete Reinforcement Specifications Institute.

A

Concrete Reinforcing Steel Institute.

32
Q

Your specifications reference this construction organization Acronym of ASHRAE that publishes numerous Technical Reference Sources. What is the correct name of ASHRAE?

American Steel Housing Rating Association of Engineers.

Associated Structural Hoists Rating Association of Engineers.

Correct American Society for Heating, Refrigerating and Air Conditioning Engineers.

Associated Society for Heating, Refrigerating and Air Conditioning Engineers.

A

American Society for Heating, Refrigerating and Air Conditioning Engineers.

33
Q

Based upon the pre 2004 version, What CSI Division contains technical information on Structural Steel?

01

03

05

15

A

05

34
Q

Based upon the pre 2004 version, What CSI Division contains technical information on Food Service Equipment?

10

11

13

15

A

11