PILOTMAN WORKING Flashcards
List two ways you can identify a Pilotman?
[2]
wearing a red armlet on left arm with Pilotman written in white letters
red flag tied around left arm
When must Pilotman working be introduced?
[7] tos delt
Token is lost Obstruction- working to and from Signal cannot be cleared due to- Disconnected or failed signal equipment Equipment failure- track circuits, signal Level crossing equipment failure Token instrument failure
Give one example of when Pilotman working is not necessary?
[1]
token provided and has the token
When Pilotman working is in operation you will be given a RT3156 ticket. Give 5 instructions the ticket will contain?
[5]
starting signal 15mph over points
end signal level crossing information
route it applies to
How can you ensure that you fully understand all the instructions the Pilotman has given you?
[1]
repeat the instructions back
As well as an RT3156 ticket, what else do you need to get from the Pilotman in order to enter the single line?
[1]
Pilotmans personal authority
What speed must you travel over the single line?
[2]
line speed unless otherwise instructed
15mph over points
When will the Pilotman not travel with every train?
[1]
When the next train will enter the section from the same point
When will the Pilotman accompany every train?
[2]
during complete block failure
working to and from point of obstruction
When Will the Pilotman not issue you with a ticket?
[6]
one train working line working to and from point of obstruction assist a failed train evacuate passengers from a failed train retrieving portion of a train removing a vehicle that has entered without authority
Your train fails on the single line. What type of protection must be laid?
[1]
assistance protection, in the direction assistance will come from
Your train fails on the single line and the Pilotman is with you, who is responsible for organising protection?
[1]
Pilotman
If you are laying protection, who must you tell prior to leaving the train?
[1]
guard
What type of working can be implemented as a interim measure prior to Pilotman working taking place?
[1]
modified working
During Modifed Working, what is the maximum speed on the single line?
[2]
50mph
15mph over points