What is the name of out managing costa managed retreat case study?
Medmerry, near Chichester.
Why was the sea allowed to breach the sea wall in 2013 in the Medmerry managed retreat?
It was land of low value.
How much did the Medmerry managed retreat cost?
£28 million
Name 4 positive outcomes of the managed retreat in Medmerry.
Creates large natural saltmarsh
Protects farmland
Protects caravan sites
Establishes wildlife habitat
What is our managing coasts hard engineering case study called?
Lyme Regis, Dorset.
When was the hard engineering Lyme Regis plan set up and why?
1990’s and to protect the coast long term.
What did phase 1 and 2 of the hard engineering at Lyme Regis include?
Sea walls, Rick armour and a shingle beach
Why did phase 3 or hard engineering at Lyme Regis not go ahead?
Costs > benefits
What was phase 4 if the hard engineering at Lyme Regis?
New sea wall and cliffs stabilised
What was the total cost of the hard engineering in Lyme Regis?
£43 million
Where is our other hard engineering case study?
Banbury
When was the last historical flood in Banbury and how much did it cost?
1998 flooding cost £12.5 million
When was the Banbury hard engineering scheme completed?
2012
Name 1 social thing that the hard engineering in Banbury did?
Raised A361
Name 1 economic thing that the hard engineering in Banbury did.
Protected over 400 houses and 70 businesses costing £18.5 billion but worth £100 million.