Performance Flashcards
When does diversion begin when using a drift down alternate?
- After engine fails
2. It is determined you can’t make it back to departure airport.
Performance for
- Dry runway
- Wet runway
- Contaminated runway
- Dry = field length x .8
- Wet = field length x .9
- Contaminated = field length x 1.15
What is the relevance of ground vehicle frictions readings?
We can use them on a chart in the performance data handbook
Pretty damn hot
- What are the bank angle limits at V2
- At V2 +5
- V2+10
- 0-15 deg
- 15-20
- 20-25
What altitude can we deviate from a simple special and proceed on course
3000’
How do the high level functions make us less susceptible to damage during a roll upset?
In normal mode flight control travel is restricted to prevent damage.
- When would you use ECS OFF
2. Describe system logic
- Short runways or high altitude airports.
- Bleed air is not available to ECS until 500’. Basically an unpressurized takeoff until 500’ then bleed valves open. I think?????
What bank angle is used on a Standard Special departure when turning.
The highest bank angle for speed. Look at previous bank angle slide.
- Standard takeoff below 1000’ IMC
2. Standard takeoff above 1000’ IMC
- Climb to 1000’ then turn to navaid or heading listed. Hold on inbound radial. Or fly HDG to safe altitude.
- Do above.
No turns before __________ in _______unless there is a ___________________
1000’ in IFR unless special departure procedure.
Simple special departure.
- Means turn is required ____________
- In IMC they are_________
- In VMC they are______________
- Fly to __________ unless radar vectors.
- Below 1000’
- Mandatory
- Mandatory to 1000’
- 3000’
Ex: 19R D3.6. 2600. LT LAS
Complex Special procedure
1. Mandatory under ______________.
- IMC AND VMC
- Wet runway
2. Contaminated runway
- Less than. 3mm of water
2. More than 25% of runway has 3mm of water,slush,snow.
POAT
- How far off before new release needed?
As long as actual OAT is not more than 10C less.
Ex. POAT = 25C
Actual OAT = 15C. DONT need new release
Actual OAT = 14C DO need new release
PQNH
- When do you need new release?
As long as actual QNH is not more than .10 less than planned.
Ex: Planned = 29.92
Actual. = 29.82 GOOD
Actual. = 29.81. Need new release