PD1096 Flashcards

1
Q

AIR SPACE REQUIREMENTS

SCHOOL ROOMS

A

3.00 cubic meters

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

WORKSHOPS, FACTORIES, OFFICES

A

12.00 cubic meters

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

HABITABLE ROOMS

A

14.00 cubic meters

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

MINIMUM EASMENTS

URBAN AREAS

A

3m

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

AGRICULTURAL AREAS

A

20m

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

FOREST AREAS

A

40m

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

MINIMUM ROOM SIZES

ROOM FOR HUMAN HABITATION

A

6.00 sqm

2.00m

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

KITCHEN

A

3.00 sqm

1.50m

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

TOILET & BATH

A

1.20 sqm

0.90m

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Eaves over required windows

A

shall at least
be 750mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Minimum Requirements: Group A Dwellings

Foundation
At least ___ thick and at least ____ below the surface of the groun

A

250mm thick

600mm below

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Floor

First floor live load:

A

200kg/sqm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Floor

Second floor live load:

A

150kg/sqm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Roof

Wind load for roofs

A

120kg/sqm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Stairs

  • At least clear width ____ with a rise of ____ and a minimum run of ____ .
A

700mm clear width
200mm rise
200mm rine

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

FIREWALL EXTENSIONS

Above the roof line

A

400mm

17
Q

FIREWALL EXTENSIONS\

Under the eaves

A

300mm

18
Q

FIREWALL EXTENSIONS

From the building edges

A

600mm

19
Q

NATIONAL ROADS OR PUBLIC HIGHWAYS

  • FOOTINGS LOCATED ATLEAST ____ BELOW GRADE
  • MAY PROJECT ____ (MAXIMUM) BEYOND THE PROPERTY LINE
A

2.40M BELOW GRADE

MAY PROJECT 300MM

20
Q

PUBLIC SIDEWALKS

  • FOUNDATIONS MAY ENCROACH ____ INTO THE SIDEWALK
  • IF TOP OF THE FOUNDATION IS AT LEAST ____ BELOW GRADE
A

500MM INTO THE SIDEWALK

600MM BELOW GRADE

21
Q

CLEARANCE OF SERVICE DROPS

  • FROM THE HEIGEST POINT OF ROOFS
A

2.50m

22
Q

CLEARANCE OF SERVICE DROPS

  • FROM THE GROUND
A

3m

23
Q

CLEARANCE OF SERVICE DROPS

  • (HORIZONTAL) FROM WINDOWS/PORCHES
A

1m

24
Q

CLEARANCE OF SERVICE DROPS

  • FROM THE CROWN OF THE STREET OR SIDEWALK
A

5.50M

25
Q

ELEVATOR HOISTWAY PIT:

A

MINIMUM 600MM

26
Q

ESCALATOR MAXIMUM INCINATION

A

30 deg horizontal

27
Q

ESCALATOR WIDTH BETWEEN BALLUSTRADES

HALL NOT EXCEED THE WIDTH OF THE STEP BY MORE THAN?

A

560MM - 1200MM

300mm

28
Q

ESCALATOR SPEED

A

38 METERS PER MINUTE MAXIMUM

29
Q

COMFORTABLE COOLING STANDARDS AC:

  • TEMPERATURE:
A

20DEG - 24DEG CELSIUS

30
Q
  • HUMIDITY:
A

50% - 60%

31
Q
  • AIR MOVEMENT:
A

4.60 - 7.60 METER PER MINUTE

32
Q

PROJECTING SIGNS

NON-ARCADED RROW

A

1.20m

33
Q

PROJECTING SIGNS

ARCADED RROW

A

.60m

34
Q

BUILDINGS ABUTTING RROW WITH SIDEWALKS

A

.30m

35
Q

SIGNS FOR VERTICAL CLEARANCE IN NON-ARCADED RROW

A

3m

36
Q

SIGNS FOR VERTICAL CLEARANCE IN ARCADED RROW

A

5m