PCAR PART 6 Flashcards
What is the title of PCAR Part 6?
a. Personnel Licensing
b. Approved Training Organization
c. Airworthiness
d. Approved Maintenance Organization
d. Approved Maintenance Organization
The person signing maintenance release or an approval for return to service shall be qualified in accordance with CAR Part _____?
a. 2
b. 3
c. 5
d. 6
a. 2
It describes the ratings (Class and/or Limited) in detail and contains reference material and process specifications used in performing repair work, along with any limitations applied to the maintenance organization.
a. Approved Data
b. Maintenance Release
c. Return to Service
d. Specific Operating Provisions
d. Specific Operating Provisions
A certification confirming that the maintenance work to which it relates has been complied with in accordance with the applicable standards of airworthiness, using approved data.
a. Approved Data
b. Maintenance Release
c. Return to Service
d. Specific Operating Provisions
b. Maintenance Release
A document signed by an authorized representative of an AMO in respect of an inspection, repair, or modification on a complete aircraft, engine, or propeller.
a. Approved Data
b. Maintenance Release
c. Return to Service
d. Specific Operating Provisions
c. Return to Service
Technical information approved by the Authority.
a. Approved Data
b. Maintenance Release
c. Return to Service
d. Specific Operating Provisions
a. Approved Data
What is the minimum rest period of a person who will perform maintenance function?
a. 8
b. 10
c. 12
d. 16
e. 20
f. 24
a. 8
What is the maximum number of consecutive hours allowed to a person performing maintenance function?
a. 8
b. 10
c. 12
d. 16
e. 20
f. 24
c. 12
A person performing maintenance functions is limited only to _____ consecutive hours of duty.
a. 8
b. 10
c. 12
d. 16
e. 20
c. 12
In situations involving unscheduled aircraft unserviceability, persons performing maintenance functions for aircraft may be continued on duty for up to _____ consecutive hours.
a. 8
b. 10
c. 12
d. 16
e. 20
f. 24
e. 20
Following unscheduled duty periods, the person performing maintenance functions for aircraft shall have a mandatory rest period of _____ hours.
a. 8
b. 10
c. 12
d. 16
e. 20
f. 24
b. 10
How long (in hours) should the person performing maintenance functions be relieved from all duties during any 7 consecutive day period?
a. 8
b. 10
c. 12
d. 16
e. 20
f. 24
f. 24
Which Part of the Philippine Civil Aviation Regulation prescribes the
requirements for issuing approvals to organizations for the maintenance, preventive maintenance, and modifications of aircraft and aeronautical products?
a. 2
b. 3
c. 5
d. 6
d. 6
Structural material made of wood, metal, ceramic plastic, fiber-reinforced materials, graphite, boron, or epoxy with built-in strengthening agents that may be in the form of filaments, foils, powders, or flakes is called a/an _____.
a. article
b. composite
c. facility
d. housing
b. composite
It can be item such as an aircraft, airframe, aircraft engine, propeller,
appliance, accessory, assembly, subassembly, system, subsystem, component, unit, product, or part.
a. Article
b. Composite
c. Facility
d. Housing
a. Article
It is defined as a physical plant, including land, buildings, and equipment, which provide the means for the performance of maintenance, preventive maintenance, or modifications of any article.
a. Article
b. Composite
c. Facility
d. Housing
c. Facility
According to PCAR Part 6, which is not a housing?
a. Building
b. Hangar
c. Working space for the performance of maintenance, preventive maintenance, or modifications for which the maintenance organization is certificated and rated
d. Structures for the proper protection of aircraft, airframes, aircraft
engines, propellers, appliances, components, parts, and subassemblies thereof during disassembly, cleaning, inspection, repair, modification, assembly, and testing
e. Structures for proper storage, segregation, and protection of materials, parts, and supplies
Idk the answer search for it
The AMO certificate consists of two documents? Which among these documents is part of the AMO certificate?
a. Approved Data
b. Maintenance Release
c. Return to Service
d. Specific Operating Provisions
d. Specific Operating Provisions
Who signed the AMO certificate?
a. Accountable manager
b. Authority
c. Accountable manager and Authority
d. CAB Executive Director
b. Authority
Who signed the Specific Operating Provisions?
a. Accountable manager
b. Authority
c. Accountable manager and Authority
d. CAB Executive Director
c. Accountable manager and Authority
A request for deviation authority must be submitted to the Authority at least _____ days before the date the deviation from specified sections in this part is necessary for the intended maintenance, preventive maintenance, or modification.
a. three (3)
b. ten(10)
c. thirty (30)
d. sixty(60)
d. sixty(60)
Which among the following options about the effectivity of certificate/rating issued to an AMO not located in the Philippines is not true?
a. From the date of issue until the Authority suspends it.
b. From the date of issue until he Authority revokes it.
c. From the date of issue until the last day of the 12th month.
d. From the date of issue until the approved maintenance organization surrenders it.
e. None of the abov
d. From the date of issue until the approved maintenance organization surrenders it.
Which among the following options about the effectivity of certificate/rating issued to an AMO located in the Philippines is not true?
a. From the date of issue until the Authority suspends it.
b. From the date of issue until he Authority revokes it.
c. From the date of issue until the last day of the 12th month.
d. From the date of issue until the approved maintenance organizationsurrenders it.
e. None of the above.
c. From the date of issue until the last day of the 12th month.
An AMO located outside the Philippines should submit their request for the renewal of certificate _____ days before its expiration.
a. three (3)
b. ten(10)
c. thirty (30)
d. sixty(60)
d. sixty(60)
A change in which of the following will result to a new certificate number?
a. Location of organization
b. Additional location
c. Housing, facilities, equipment, tools, material, procedures, work scope,
and certifying staff
d. Ratings
e. Name of organization
f. Ownership
g. Accountable manager
h. List of management personnel
f. Ownership
How many AMO ratings are there?
a. Two (2)
b. Three (3)
c. Four (4)
d. Seven (7)
d. Seven (7)
How many classes are there under airframe rating?
a. Two (2)
b. Three (3)
c. Four (4)
d. Seven (7)
d. Seven (7)