Q

Determine inspection intervals for Thickness Measurements & Externals

A

Inspector OR Engineer (Code Conflict)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

At Repairs & Alterations, approve all methods of design, materials, WPSs, NDE & testing?

A

Inspector OR Engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Review leak sealing procedures?

A

Inspector OR Engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Perform rerating calculations?

A

Inspector OR Engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Perform On-Stream inspections?

A

Inspector or Examiner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Take thickness measurements?

A

Inspector or Examiner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

PMI new materials during repairs & alterations?

A

Inspector or Examiner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

To understand damage mechanism, select type & extent of NDE, Inspector consults with…?

A

Engineer OR Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Revise an existing interval that has unusual degradation issues. Inspector and:

A

Engineer OR Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Determine inspection intervals for Thickness Measurements & Externals

A

Inspector OR Owner/User (Code Conflict)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Perform External Inspection?

A

Inspector OR qualified other

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Determine the inspection interval for Pressure Relief Devices?

A

Inspector OR engineer OR qualified other