Old Machine - 1993 Recommendations Flashcards

1
Q

What is the first thing done when doing a machine check?

A

Verify Backup Ventilation
Equipment is Available &
Functioning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

After checking for emergency ventilation equipment, what do you check on the machine first?

A

Check Oxygen Cylinder
Supply

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

You are checking the oxygen cylinder on the machine - what amount is necessary?

A

Half full or about 1000 PSI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

You have verified cylinder supplies. What do you check next?

A

Check central pipeline supplies - hoses should be connected with gauges reading 50 PSI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

You have completed your checks of the high and intermediate pressure systems - what is your next step?

A

Check initial status of low pressure system

  • close flow control valves
  • turn off vaporizers
  • check fill level and tighten vaporizer filler caps
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

You have done your initial check of the low pressure system - describe how you perform a leak check of the low pressure system

A
  • Master switch, flow control valves off
  • attach a suction bulb to common gas outlet
  • squeeze bulb until fully collapsed
  • verify the bulb stays fully collapsed for at least 10 seconds
  • open one vaporizer at at ime and repeat the bulb test
  • remove bulb and reconnect fresh gas hose
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What do you do following your low pressure leak test?

A

Turn on the machine master switch and all other necessary electrical equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

You have turned on your master switch and all other necessary electrical equipment - Whats next?

hurry, Dr. Herring is staring at you like you are an ignorant slut

A

Test flowmeters

  • ensure full range and smooth operation
  • attempt to create hypoxic mixture
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Your low pressure system is good to go - what do you check next?

A

Scavenging system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Describe the check of the scavenging system

A
  • Ensure connections from APL valve to scavenging system and vent relief valve to scavenging system
  • Adjust waste gas suction
  • Fully open APL valve and oclude Y-piece
  • Allow scavenger reservoir bag to collapse and verify absorber pressure is about 0
  • Activate O2 flush and allow scavenger reservoir bag to fully distend - ensure absorber pressure is less than 10
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which system is checked following the scavenging system?

A

Breathing system/circuit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How do you calibrate the O2 monitor?

A
  • Ensure monitor reads 21% in room air
  • Verify low O2 alarm is enabled and functioning
  • Reinstall sensor into the circuit and flush system with O2
  • Verify that monitor now reads > 90% oxygen
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

You have calibrated your O2 monitor - describe the inital status check of the breathing system

A
  • set selector switch to bag mode
  • check breathing circuit is complete, undamaged, and unobstructed
  • verify CO2 absorber is adequate
  • Install breathing circuit accessory equipment: humidifier, PEEP valve, etc.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Describe the leak check of the breathing system

A
  • Set gas flow to 0 or minimum
  • close APL valve and occlude Y-piece
  • Pressurize breathing system to about 30 cmH2O with O2 flush
  • Ensure that pressure remains fixed for at least 10 seconds
  • open APL valve and ensure that pressure decreases
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

After performing your breathing system leak test, you are ready to test the ventilation systems - pls describe boi

A
  • Place breathing bag on Y-piece
  • Set vent parameters and switch to automatic ventilation
  • Fill bellows and breathing bag with O2 flush and turn vent on
  • O2 on minimum, other gases off
  • Ensure that tidal volume is delivered and bellows fill on expiration
  • O2 up to 5 L/min and verify ventilator bellows and “lungs” fill and empty without sustained pressure
  • Check unidirectional valves
  • Turn off vent and switch to manual
  • Use the bag to ensure inflation and deflation of artificial lungs
  • Remove second bag
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What alarms/monitors need to be checked and verified at the end of the machine check?

A
  • capnometer
  • pulse oximeter
  • oxygen analyzer
  • respiratory volume monitor
  • pressure monitor
16
Q

What is the final status of your machine following machine check?

A
  • vaporizers off
  • APL valve open
  • selector switch to bag
  • all flowmeters off
  • Patient suction adequate
  • breathing system ready to use