Objective 05: Pressure Vessel Inspection Flashcards
1
Q
What is the first step in Pressure Vessel Inspection?
A
To identify the inspection tasks required, as well as safety requirements and preparation tasks
2
Q
How can Pressure Vessel Inspection Tasks be divided?
A
- Preparation
- Safety Requirements
- Inspection
- Completion
3
Q
What does Pressure Vessel Inspection Preparation entail?
A
- Obtain special tools
- Pick up spare parts
- Travel to the location of the pressure vessel
4
Q
What does Pressure Vessel Inspection Safety Requirements entail?
A
- Obtaining work permit
- Isolating the pressure vessel and depressurizing it
- Performing a safety check before putting the vessel back into service
5
Q
What does the actual inspection of a Pressure Vessel entail?
A
- A thorough visual inspection of the vessel for corrosion or other signs of deterioration
- An ultrasonic inspection of wall thickness at predetermined points
- Replacement of the relief valve
6
Q
What does completion of a Pressure Vessel Inspection entail?
A
- Returning the pressure vessel to service and verifying proper operation
- Returning the relief valve to the repair shop
- Traveling back to the maintenance shop
- Documenting the results on the work order and official inspection forms
7
Q
What are the 3 types of workers required to perform a Pressure Vessel Inspection?
A
- Operator
- Technician or technologist for the ultrasonic inspection
- Maintenance worker to replace the relief valve and perform the visual inspection