OA MSTE Problems Flashcards
12 faces polyhedron, 12 regular pentagon; DETERMINE THE NUMBER OF EDGES
60
45
15
30
30
Metal Sphere, G=3, M=34kg, recasted into a metal cone, 6cm radius, 12% volume loss
WHAT IS THE PERPENDICULAR HEIGHT OF THE NEW CONE
264.5
214.8
352.8
526.3
264.5
circle equation, x² + y² +2ky = 0, length of tangent from (5,4) to the circle is 1, VALUE OF K?
-3
-2
-4
-5
-5
Approximate shortest day of the year
Dec 19/20/21
Approximate shortest day of the year
Dec 19/20/21
A person driving her car 45 kph approaches an intersection just as the traffic lights turns yellow. She knows that the yellow light lasts only 2.0 sec before turning red and she is 28 m from the near side of the intersection. Should she try to stop, or she speeds up to cross the intersection before the light turns red? The intersection is 15 m wide. Her car’s maximum deceleration is -5.8 m/s², whereas it can accelerate from 45 kph to 65 kph in 6.0 sec. Ignore the length of her car and her reaction time.
A. She should speed up to cross the intersection before the light turns red.
B. She should adjust the rate of deceleration and wait for the next red light.
C. She should adjust the rate of deceleration, stop and wait for the next green light.
D. She should maintain the rate of deceleration and continue as she would pass through the intersection against the green light.
C. She should adjust the rate of deceleration, stop and wait for the next green light.
An 80-m spiral connects a tangent with a 180-m radius circular curve. The maximum velocity in kph that a car could pass through the curve without skidding is nearest to:
A. 72.58
B. 78.54
C. 71.24
D. 73.68
73.68
Given the following cross-section notes for a road grading work…
-3.2/x1…
The roadbed is 9’m wide and the side slope for cut is 1:1 and for fill is 1.5:1. Determine the area of cut of the section.
A. 15.425 sq. m.
B. 7.563 sq. m.
C. 9.402 sq. m.
D. 3.142 sq. m
9.402 sq. m
The cross-sectional area of a road with width of 10 m is 42.9 square meters. The cross-sectional area is as follows:
9.8/2.4…
Determine the value of x.
A. 3.45 m
C. 3.94 m
B. 3.70 m
D. 2.45 m
3.94 m
In the measures of congestion of highway capacity, what will happen as the density continues to increase?
A. Running speed and traffic flow is minimum
B. The point is reached at which speed declines noticeably
C. Minimum rate flow is eventually reached
D. Increase speeds and reduced flow rate
The point is reached at which speed declines noticeably
Device mounted on a fixed support (permanent signs) or portable support (temporary signs) whereby a specific message is conveyed by means of words or symbols placed or erected for the purpose of regulating, warning or guiding traffic.
A. Special instruction signs
C. Traffic signs
B. Roadwork signs
D. Overhead signs
Traffic Signs
What is the process of proportioning the cement, water, aggregates and additives prior to mixing concrete called?
A. Batching
C. Paving
B. Curing
D. Mixing
Batching
What is the process of proportioning the cement, water, aggregates and additives prior to mixing concrete called?
A. Batching
C. Paving
B. Curing
D. Mixing
Batching
Determine the elevation of residual water level (RWL) for the sheet pile type if the following data are as follows:
Elev. Of MLL, W (datum) = 0.00 m Elev. Of HWL = + 1.26 m Elev. Of LWL -0.23m
A. +0.82 m
B. +0.76 m
C. +0.63 m
D. +0.96 m
0.76
A wave generated in deep water, when reaching shoaling waters, charges not only in its height but also in its length but the period will
A. Decrease
B. Remain Constant
C. None of these
D. Increase
Decrease,
speed of the wave = k(water depth)