NVZs & Pollution Flashcards

1
Q

Main Legislation

A
  • Water Resources (Control of Agricultural Pollution) (Wales) Regulations 2021
  • Water Resources (Control of Pollution) (Silage & Slurry) (Wales) Regulations 2010 (until 1st August 2024)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the purpose of NVZs and how are they enforced?

A
  • To protect water quality from nitrates from agricultural activities/sources.
  • Part of Cross Compliance (GAECs & SMRs) so non-compliance will result in penalties to Glastir & BPS payments.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How can you identify if your holding is within an NVZ?

A

1st April 2021 - the whole of Wales was designated an NVZ under the Water Resources (Control of Agricultual Pollution) (Wales) Regulations 2021

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the record keeping requirements within an NVZ?

A
  • Import and exports of manue
  • NMAX Limit
  • Risk Maps
  • Applications of fertiliser
  • Calculation of manure storage
  • Temporary field heap rules
  • Nitrogen limits
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How would you prepare NVZ Risk Map?

A
  1. Identify holding on map with recognised scale - 1:2500, 1:5000, 1:10,000 showing every field & watercourses, area of each field any boreholes, springs or wells.
  2. Identify watercourses in colour red, where spreading is prohibited - within 10m surface water or 50m of a borehole, spring or well.
  3. Identify land type in colour red, where spreading is prohibited - sandy or shallow soils, slope more than 12 degrees & land drains.
  4. Identify other features in colour red, where spreading is prohibites - tenancy restrictions, designations (SSSIs), Rocky areas where equipment cannot be used safely, woodlands & tracks.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the phased approach to NVZs in Wales

A

1st April 2021:
- Notify NRW 14 days before commencement of works
- Closed spreading period for organic manure on grassland (15th Sept - 15th Jan)

1st January 2023:
- Risk Map
- 170kg limit
- Import & export records
- Temporary field sites (not within 30m of watercourse or 10m of surface water)

1st August 2024:
- 5 / 6 Months storage
- Closed period for spreading Nitrogen fert on Grassland 1st Sept - 31st December

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Silage Clamp Requirements:

A
  • Impermeable Base, Pipes, Tanks & Drains.
  • Floor must extend beyond Walls
  • Not within 10m of water course or land drains
  • Effluent tank must be capable of last 20 years without maintenance
  • Walls must be resistant to attack from silage effluent
  • All effluent must be collected and contained
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Slurry Store Requirments:

A
  • Imperable Store, Drains, Pipes & Tanks.
  • Base, Walls, Pit, Pipe must be protected against corrosion.
  • Effluent tank must be capable of lasting 20 years with necessary maintenace.
  • If walls not imperable - base must extent beyond walls and have permiter drains that connect to tank.