Who calls for all checklists while on the ground?
The Captain.
Reference: OM Vol. 1, Section 3, Checklist Procedures
Who may do the Termination checklist?
The Termination checklist may either be performed as a single pilot checklist, or by having the First Officer challenge and the CA respond to all items.
Reference: OM Vol. 1, Section 3, Checklist Procedures
When must the full Receiving checklist be accomplished?
If a Terminating checklist was completed on the previous flight. If there was a change in crew.
If any maintenance action/inspection has taken place.
Anytime the configuration of the aircraft may have been changed during a ground layover.
Reference: OM Vol. 1, Section 3, Checklist Procedures
May “XR Only” checklist items be skipped if in an LR/EP?
Yes
What items must be checked on the Safety Inspection?
As approaching the aircraft: Wheel chocks in place Flight control surfaces clear Fluid leaks Service being performed Inside the aircraft: Applicable switches are in the proper position prior to power-up Parking brake set radar to stby Gust lock engaged Aileron/elevator disconnect handles are in Landing gear handle down Electric hydraulic pumps are off Slam latch operation (first flight of the day) Cockpit door vent louver is open Circuit breakers Reference: OM Vol. 1, Section 3, Receiving Checklist
May a CB be reset prior to power up?
If a circuit breaker is tripped on the ground, do not reset until contacting Maintenance Control to discover the cause.
Reference: FOM Section 2, Tripped Circuit Breaker Procedure
What emergency equipment is located in the cockpit?
2 escape ropes, 3 smoke goggles, 3 life jackets, 1 PBE, 1 Halon extinguisher, 1 crash ax, 2 flash lights.
Reference: OM Vol. 1, Section 3, Receiving Checklist
Is the Supplementary Performance Manual required to be on board?
No. However if it is missing, it should be replaced as soon as practicable.
Reference: OM Vol. 1, Section 3, Receiving Checklist
What is the procedure to use if the status LED light for the CVR does not illuminate?
Plug a headset into the CVR plane, press the TEST button and listen for a tone.
Reference: OM Vol. 1, Section 3, Receiving Checklist
When must you start the APU as soon as possible after establishing power to the aircraft?
If the battery voltage is below 24V but more than 19V.
Reference: OM Vol. 1, Section 3, Receiving Checklist
How do you test the crossfeed valve?
Go to LOW 1 and LOW 2, look for the FUEL XFEED OPEN advisory message and for the respective pump to turn off.
Reference: OM Vol. 1, Section 3, Receiving Checklist
What EICAS messages are shown during a fire detection test?
ENG 1(2) FIRE, APU FIRE, BAGG SMOKE, E1 (2) FIRE DET FAIL, and APU FIREDET FAIL. Reference: OM Vol. 1, Section 3, Receiving Checklist
What is the procedure to use if, after a fire test, if the BAGG EXT button remains illuminated?
Wait 6 seconds, then repeat the test by pressing and holding the fire detection test button for at least 2 seconds.
Reference: OM Vol. 1, Section 3, Receiving Checklist
When does the APU Generator come online?
Once reaching 95% plus 7 seconds (unless GPU is being used).
Reference: OM Vol. 2, Section 2-9, APU Starting/Operation
What procedure is used if the APU generator exceeds 500 Amps?
Turn the #1 BATT knob to OFF. Once 3 minutes have passed or the load decreases below 400 A, whichever occurs later, turn the #1 BATT knob back to AUTO and place the shed bus selector to OVRD.