Normal Checklists Callouts Flashcards
what should the PM announce when the checklist is complete?
“xxxxxxx CHECKLIST COMPLETE”
What is the callout to resume a checklist?
“RESUME CHECKLIST AT _____”
after an interruption, the last completed item should be repeated.
What is the callout to hold a checklist?
“HOLD CHECKLIST AT ______”
what is the correct way to do a checklist?
1) PM reads the challenge
2) PF checks the current status of the aircraft (if the current status of the aircraft does not correspond to the checklist response, the PF takes corrective action before responding to the challenge, if corrective action is not possible, then the PF must modify the response to reflect the real situation)
3) PF responds to the challenge
4) PM crosschecks the response corresponds to the checklist