NC One Call Flashcards
The One Call Center (811) receives notification from _______ then notifies _________ who have underground utilities in the area
Excavators; member utilities
The ______ locate and mark their utilities within ______ of the notification
member utilities; 2 working days
True of False- There is a charge to the excavator to locate utilities
False
The excavator should notify each utility owner no less than 2 working days nor more than _____ prior to starting the excavation
10 working days
If a utility owner is not a member of the One-Call network, the person excavating should _________
Notify the utility owner directly
T/F -If the utility fails to respond to a request to mark utilities, the excavator may proceed (48 hours after notification)
True
A 811 ticket may contain many addresses as long as ______
The addresses are on one street within a one block range
In an apartment complex, individual building or lot numbers should go on ________
Different tickets
When an 811 excavation involves more that one street, each street should _______
Go on an individual notification
In an 811 ticket, an intersection can__
Go on 1 notification
APAW color- white
Proposed excavation
APAW color- Pink
Temporary Survey Markings
APAW color- Red
Electric, Cables, Conduit, Lighting cables
APAW color- Yellow
Gas, Oil, Steam, Petroleum or gaseous materials
APAW color- Orange
Communication, Alarm or signal lines, cables or conduit