1
Q

Who is responsible for ensuring that facilities are properly marked?

A

811

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How many days notice should you give to utilities owners before you dig if the site does not involve a subaqueous facility?

A

3 -12 full working days before commencement date

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Who is responsible for making the call to the NC One-Call Center?

A

Anyone planning to dig in public spaces or in private easements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How many days notice should you give to utilities owners before you dig if the site does involve a subaqueous facility?

A

10 - 20 full working days before commencement date

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Who do you call if the utility provider is not a member of the One-Call Center?

A

You must contact the utility owner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

If an operator fails to respond to the Positive Response System, the excavator must wait how long after an additional call is made to the Notification Center?

A

3 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

If an operator fails to respond to the Positive Response System, and the excavator is aware of or observes indications of an unmarked facility at the proposed excavation or demolition area

A

the excavator shall not begin excavation or demolition until an additional call is made to the Notification Center

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Who is responsible for notifying the facility owner if damage is done or suspected?

A

The excavator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What color is the utility marking flag for a gas line?

A

yellow

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What color is the utility marking flag for electric power lines?

A

Red

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What color is the utility marking flag for potable water?

A

Blue

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What color is the utility marking flag for sewer lines?

A

Green

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What color is the utility marking flag for temporary survey markings?

A

pink

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Which of the following will be asked for when a ticket notification is being made?

A

All of these. Excavator information, email address, and county and subdivision.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

When crossing underground utilities within the tolerance zone, what type of tools should be used?

A

Hand tools until the marked facility is exposed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

When working at an intersection and the excavation area will be no more than 1/4 mile down two or more streets, then how many notifications are required?

A

One

17
Q

A separate excavation ticket must be submitted when?

A

excavation area changes blocks

18
Q

What is the maximum geographical length for a request to locate?

A

1/4 mile in geographical length or five adjoining addresses

19
Q

How is “working day” defined for the NC 811 system?

A

Every day except Saturday, Sunday, National legal holidays and State legal holidays

20
Q

How many days after the notice is received do NC 811 member facility operators have to mark their facilities?

A

3 full working days

21
Q

How long are tickets good for after notice is given?

A

15 working days

22
Q

When should a ticket be updated?

A

On the 12th day if the work has not been completed

23
Q

When can excavators begin excavation?

A

Not until all underground facilities have been marked

24
Q

When demolition of a building is proposed, what information is required on the notice?

A

All of these. Contact information of excavator, type of proposed excavation, and whether or not explosives will be used

25
Q

According to NC One-Call, the excavator must maintain a clearance between the location of the underground utilities and what, in order to avoid damage to the utility?

A

The cutting edge or point of any mechanized equipment

26
Q

The excavator shall not use mechanized equipment within what range of a facility that is a gas, oil, petroleum, or electric transmission line without written permission of the facility operator?

A

24 inches

27
Q

How many members shall serve on the Underground Damage Prevention Review Board?

A

15 Governor appointed members

28
Q

What is the maximum civil penalty that may be imposed by the UDPRB?

A

$2,500

29
Q

If a violating party elects to initiate an arbitration proceeding, they shall pay a filing fee of what amount?

A

$250

30
Q

What is the strip of land adjacent to a lake or natural watercourse?

A

Buffer zone

31
Q

The process by which sediment resulting from accelerated erosion has been transported off the site is known as

A

Sedimentation

32
Q

Erosion and sedimentation control measures, structures, and devices shall be so planned, designed, and constructed to provide protection from the runoff of which of the following?

A

10-year storm

33
Q

Who is responsible for maintaining the erosion and sedimentation control devices at the job site?

A

The person financially responsible for site development and possibly the land owner

34
Q

What is the minimum width (measured horizontally from the top of the bank) for an undisturbed buffer zone adjacent to designated trout waters?

A

25ft

35
Q

Where a temporary disturbance is permitted in the buffer zone adjacent to designated trout waters, the land-disturbing activities shall be limited to a maximum of what amount?

A

10% of the total length of the buffer zone

36
Q

Graded slopes must be planted with vegetation or otherwise stabilized within how many working days

A

21 days

37
Q

An erosion and sedimentation control plan must be submitted at least how many days before land disturbance begins for any site larger than 1 acre?

A

30 days

38
Q

The Secretary may issue a stop-work order if they find

A

Any of these

39
Q

What is the maximum number of days for which a stop-work order may be issued?

A

5 days