NAVEDTRA 14233A, NAVAL CONSTRUCTION FORCE:SEABEE 1 & C Chapter 9 Flashcards

1
Q

Activities with less than how many equivalent (in-house plus contractor) personnel in the Maintenance and Utilities Divisions are classified as small activities and fall under the purview of NAVFAC MO-321? (Page 9-4)

A

75

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Activities with less than how many equivalent personnel are classified as medium? (Page 9-4)

A

75-250

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How many key elements of the Maintenance Management System are there? (Page 9-5)

A

Five

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What control provides basic planning and status information on work from inception to completion? (Page 9-5)

A

Work input

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the installation’s facilities life cycle experts, responsible and accountable for the effectiveness and efficiencyof the shore establishment? (Page 9-6)

A

Public Works Department (PWD)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who is the warranted Civil Engineer Corps (CEC) officer responsible for PWD organization, operations, administration, and supervision? (Page 9-7)

A

Public Works Officer (PWO)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Who is the senior civilian in the PWD with the responsibility of operational execution of the Public Works’ mission and serves as the first line supervisor of the FMD, FEAD, and Production Divisions? (Page 9-8)

A

DPWO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Who is the single safety point of contact at PWDs? (Page 9-8)

A

SSM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What serves as the point of work generation for the installation and provides the management of real property (land and buildings)? (Page 9-8)

A

FMD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is responsible for acquisition planning and contract administration of construction and service contracts from design to delivery? (Page 9-9)

A

FEAD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What form should be submitted for any work request by a customer that will take longer than a service call (more than 16 man- hours)? (Page 9-10)

A

NAVFAC Form 9-11014/20

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the examination, lubrication, minor adjustment, and minor repair of equipment and systems for which a specific operator is not assigned? (Page 9-12)

A

PMI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is a scheduled examination and/or test of shore facilities to determine the physical condition with respect to the required level of maintenance? (Page 9-12)

A

Control inspection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How many classifications of work are used at Public Works? (Page 9-13)

A

Five

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Recurring work is any work required to return a facility, system, equipment, or component to normal working condition that does not exceed what amount or other threshold as established by the PWO or FEC? (Page 9-14)

A

$2,500

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Service work is work that is minor in scope and can be accomplished in how many hours or less? (Page 9-14)

A

16

17
Q

What amount are minor work authorizations limited to? (Page 9- 14)

A

$25,000

18
Q

The goal is to respond to specific work within 90 days and complete the work within how many days? (Page 9-15)

A

150

19
Q

Specific job orders should be used for work that takes more than how many man-hours to complete? (Page 9-15)

A

80

20
Q

Labor class codes are how many digit numbers that represent various categories of overhead and productive work? (Page 9-17)

A

Two

21
Q

Who defines the scope of a project by specifying the work to be accomplished and the skills required? (Page 9-20)

A

Estimator

22
Q

What publication should be used when preparing scoping estimates? (Page 9-21)

A

NAVFAC P-716.0

23
Q

What should be the most accurate forecast possible of the costs, man-hours, and material requirements for a given job? (Page 9-21)

A

Final estimates

24
Q

What is the Public Works management plan for using shop forces on specific job orders for a given month? (Page 9-25)

A

Shop Load Plan (SLP)

25
Q

The long range portion of the SLP covers the following how many months? (Page 9-26)

A

9