NATOPS "SAR Safety Precautions" Flashcards
Static Electricity
Helicopters create static electricity that must be discharged by grounding the hoist on the surface prior to commencing a pickup. The surface in the immediate vicinity of a crash site may be covered with fuel. Avoid discharging static charge or deploying smoke markers in that zone.
Parachute
If a parachute remains in the area of the survivor, maintain a minimum of 1 rotor disk separation between parachute canopy and rotor downwash.
Hoist Cable
The rescue hoist cable must be kept clear of all parts of the aircraft and free from other external obstacles when operating the hoist. Cable abrasion during hoist operations can lead to cable failure. If cable contact or snagging occurs, suspend hoist operations and inspect the cable for damage in accordance with applicable procedures.
Swimmer
Swimmer shall not be required to enter the water to effect the recovery of inanimate objects.
There shall be a
There shall be a hoist operator in the cabin if a swimmer is deployed.
Personnel hoist
Personnel hoist shall not be attempted with a damaged cable.
Hoist operator
The hoist operator shall wear a heavy-duty glove during all rescue hoist operations.