NAMP Flashcards
What’s the NAMP publication?
4790.2 series
What’s the MOs responsibility
Head of maintenance department
What’s the AMOs responsibility
Assistant head of maintenance
What does the MMCO do
Responsible for overall production and material support
What is rework
Restorative and additive work
What is upkeep
Preventive, restorative or additive work
How long is a turnaround good for?
24 hours provided that no flight occurs or maintenance
How long is a daily good for?
Valid for 72 hours without flight or major maintenance
What is a special inspection
Schedule inspection with prescribed intervals
What is conditional maintenance
Unscheduled events
What does RCM stand for
Reliability Centered maintenance
What is the difference between maintenance Control and production control?
Maintenance is at O-Level
Production is at I-level
What are two of the most critical aspects in naval aviation?
Release of an aircraft safe for flight
The acceptance of the aircraft
What’s in the MMP
SE
Materials
Manpower
Workload
When is the MMP prepared and distributed
25th at O level
1st at I level