NACE CIP Level 1 Flashcards
NACE 1 is equivalent to _________
SSPC-SP 5
White Metal Blast Cleaning
NACE 2 is equivalent to _________
SSPC-SP 10
Near White Metal Blast Cleaning
NACE 3 is equivalent to _________
SSPC-SP 6
Commercial Blast Cleaning
NACE 8 is equivalent to _________
SSPC-SP 14
Industrial Blast Cleaning
NACE 4 is equivalent to _________
SSPC-SP 7
Brush Off Blast Cleaning
White Metal Blast Cleaning is __________________
NACE 1 (SSPC-SP 5)
Near White Metal Blast Cleaning is __________________
NACE 2 (SSPC-SP 10)
Commercial Blast Cleaning is __________________
NACE 3 (SSPC-SP 6)
Industrial Blast Cleaning is __________________
NACE 8 (SSPC-SP 14)
Brush Off Blast Cleaning is __________________
NACE 4 (SSPC-SP 7)
When viewed without magnification, the surface shall be free from visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products, and other foreign matter.
NACE 1 (SSPC-SP 5)
White Metal Blast Cleaning
When viewed without magnification, the surface shall be free from visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products, and other foreign matter. Random staining shall be limited to no more than 5% of each unit area of surface and may consist of light shadows, slight streaks, or minor discolorations cause by stains of previously applied coatings.
NACE 2 (SSPC-SP 10)
Near White Metal Blast Cleaning
When viewed without magnification, the surface shall be free from visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products, and other foreign matter. Random staining shall be limited to no more than 33% of each unit area of surface and may consist of light shadows, slight streaks, or minor discolorations cause by stains of rust, stains of mill scale, or previously applied coatings.
NACE 3 (SSPC-SP 6)
Commercial Blast Cleaning
When viewed without magnification, the surface shall be free from visible oil, grease, dust, dirt. Traces of light adherent mill scale, rust, and coating residues are permitted to remain on 10% of each unit area of the surface if they are randomly distributed. The traces of mill scale, rust, and coating are considered tightly adherent if they cannot be removed by lifting a dull putty knife. Shadows, streaks, and discolorations caused by stains of rust, stains of mill scale, or stains of previously applied coatings may be present on the remainder of the surface.
NACE 8 (SSPC-SP 14)
Industrial Blast Cleaning
When viewed without magnification, the surface shall be free from visible oil, grease, dust, dirt, loose mill scale, loose rust, and loose coating. Tightly adherent mill scale, rust, and coating may remain on the surface. Mill scale, rust, and coating are considered tightly adherent if they cannot be removed by lifting a dull putty knife.
NACE 4 (SSPC-SP 7)
Brush Off Blast Cleaning
Sa 3 is __________________
Blast Cleaning to Visually Clean Steel
Sa 2 1/2 is __________________
Very Through Blast Cleaning
Sa 2 is __________________
Through Blast Cleaning
Sa 1 is __________________
Light Blast Cleaning
St 2 is __________________
Thorough Hand and Power Tool Cleaning
St 3 is __________________
Very Through Hand and Power Tool Cleaning
When viewed without magnification, the surface shall be free from visible oil, grease, dust, dirt, and shall be free from the mill scale, rust, paint coatings, and other foreign matter. It shall have a uniform metallic color.
Sa 3
Blast Cleaning to Visually Clean Steel
When viewed without magnification, the surface shall be free from visible oil, grease, dust, dirt, and shall be free from the mill scale, rust, paint coatings, and other foreign matter. Any remaining traces of contamination will show only as slight stains in the form of spots or stripes.
Sa 2 1/2
Very Through Blast Cleaning
When viewed without magnification, the surface shall be free from visible oil, grease, dust, dirt, and shall be free from most of the mill scale, rust, paint coatings, and other foreign matter. Any residual contamination shall be firmly adhering.
Sa 2
Thorough Blast Cleaning
When viewed without magnification, the surface shall be free from visible oil, grease, dust, dirt, and from poorly adhering mill scale, rust, paint coatings, and foreign matter.
Sa 1 or St 2
Sa 1 - Light Blast Cleaning
St 2 - Thorough Hand and Power Tool Cleaning
When viewed without magnification, the surface shall be free from visible oil, grease, dust, dirt, and from poorly adhering mill scale, rust, paint coatings, and foreign matter.
Sa 1 or St 2
Sa 1 - Light Blast Cleaning
St 2 - Thorough Hand and Power Tool Cleaning
Same as for St 2, but the surface shall be treated much more thoroughly to give a metallic sheen arising from the metallic substrate.
St 3
Very Through Hand and Power Tool Cleaning
Removes all loose mill scale, loose rust, loose paint and other loose detrimental foreign matter. It is not intended that adherent mill scale, rust, and paint be removed by this process. Mill scale, rust, and paint are considered adherent if they cannot be removed by lifting a dull putty knife.
SSPC-SP 2 or SSPC-SP 3
SSPC-SP 2 - Hand Tool Cleaning
SSPC-SP 3 - Power Tool Cleaning
When viewed without magnification, shall be free from visible oil, grease, dust, dirt, coating, oxides, mill scale, corrosion products, and other foreign matter. Random staining shall be limited to no more that 33% of each unit area of surface. Staining may consist of light shadows, slight streaks, or minor discolorations caused by stains of rust, stains of mill scale, or stains of previously applied coatings. Slight residues of rust and paint may also be left in the bottom of the pits if the original surface is pitted.
SSPC-SP 15
Commercial Grade Power Tool Cleaning
A steel surface cleaned with power tools to bare metal, when viewed without magnification, shall be free from visible oil, grease, dirt, dust, coating, oxides, mill scale, corrosion products, and other foreign matter. Slight residues of rust and paint may also be left in the bottom of the pits of the original surface if the original surface is pitted.
The surface profile roughness shall be a minimum of 25.4 um (1.0 mil) as measured in accordance with Method C of ASTM D 4417 or other mutually agreed upon method. The peaks and valleys on the surface shall form a continuous pattern with no smooth unprofiled spots in between.
SSPC-SP 11
Power Tool Cleaning to Bare Metal
SSPC-SP 2 is __________________
Hand Tool Cleaning
SSPC-SP 3 is __________________
Power Tool Cleaning
SSPC-SP 15 is __________________
Commercial Grade Power Tool Cleaning
SSPC-SP 11 is __________________
Power Tool Cleaning to Bare Metal
NACE SP0188 is __________________
Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates
SSPC PA-2 is __________________
Measurement of Dry Coat Thickness w/ Magnetic Gauges
NACE SP0178 is __________________
Design, Fabrication, and Surface Finish Practices for Tanks and Vessels to be Lined for Immersion Service
ASTM D 4417 is __________________
Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel
If a steel bridge is corroding in a mild environment, the corrosion process is defined as which of the following?
Electrochemical
Based on the galvanic series presented in NACE CIP Level 1 Manual, which three materials are commonly used as galvanic anodes for carbon steel?
Zinc, aluminum, magnesium
A decrease in temperature will generally cause the corrosion rate to ___________
Decrease
The electrolyte is a medium which carries the following type of current?
Ionic
A proper coating specification should contain information regarding which of the following?
Surface preparation standards
Safety
Locations to be coated
According to NACE attestation, when is it ok to accept a gift from a contractor?
Never acceptable
What should you do if you find discrepancies between the specification and coating manufacturers product data sheet?
Seek written clarification from the owners representative.
A materials inventory report should contain which of the following?
Quality of each component of each material onsite
Material batch numbers
Date of materials arrival on job site and storage information
Inspection reports typically provide sufficient detail permitting the owner to evaluate?
Contractor performance
Inspector performance
Job progress
Work interruptions
The primary function of the coating inspector is ______________
Specification compliance
When a conflict occurs on a coating project, as the inspector, the preferred first course of action is to _________________
Actively listen and endeavor to understand the position of others.
Which of the following are commonly used primers for steel structures?
Epoxy
Inorganic Zinc
Organic Zinc
What coating does not stick to steel?
Vinyl Ester
The requirements of a coating project are defined by which of the following?
Coating specification
A pre job conference is useful for discussions on which of the following?
Safety
Cleaning
Application
Schedule
A pre-job conference should be held ____________?
After bids have been submitted and contracts signed.
Which of the following are goals at the pre-job conference?
Review and discuss scope of work
Discuss lines of communication between parties
Discuss and clarify inspectors responsibilities and authority
What is the inspectors role at a pre-job conference?
Clarify reporting requirements
Inspection records may be used to ______________
Help in resolving legal or arbitration disputes
Assist owners in the evaluation of the applicators performance
Assist owners in the evaluation of the inspectors performance
Determine total cost of the project
Which of the following are co-reacting?
Polyurethane
Epoxy
Which of the following coatings may require external moisture to cure?
Single component polyurethane
Solvent borne inorganic zinc
Amine blush is likely to occur with which type of coating?
Epoxy
Which coating cures the fastest?
Polyurea
Coatings that cure by polymerization are _______________
Convertible
Waterborne latex coatings cure by a process known as ________________
Coalescence
When applied to concrete, alkyd coatings will fail prematurely due to _______________
Saponification
You are the inspector on a project with a sprayed polyurethane coating. The most probable safety concern is _______________
Isocyanates
On blast cleaned surfaces, an ultraviolet light can reveal ________
Oil
The power tool standard for cleaning to bare metal with a minimum profile of 1 mil (25.4 microns) is ______________
SSPC-SP 11
SSPC VIS 1 rust grade defines a surface covered with both mill scale and rust?
Grade B
One advantage to a conventional spray is ____________
Applicator control
The formation of small bowl shaped depressions in the coating film caused by air trapped in the coating is called ______________
Cratering
What are the three methods by which a coating provides corrosion control?
Barrier
Inhibitive
Sacrificial
Two broad classifications for curing mechanisms are?
Convertible
Non convertible
List two non convertible coating types.
Chlorinated rubber
Vinyl
List four convertible coating curing mechanisms.
Oxidation
Co-reaction (polymerization)
Hydration
Fusion