Module 12 - Erosion and Sediment Control BMPs in Alabama Flashcards
Erosion Control Blanket: Which of the folling provides only the minimum amount of erosion resistance?
Biodegradable Erosion Control Blanket
Permanent Erosion Control Blanket
Turf Reinforment Mat
Netting
Netting
Inlet protection is a practice of …
Runoff conveyance
Site preparation
Sediment Control
Surface stabilization
Sediment Control
Which cross-sectional grass swale shapes are common?
Parabolic and triangular.
Round.
Triangular, parabolic, or trapezoidal.
Trapezoidal.
Triangular, parabolic, or trapezoidal.
When mulching a sloped area …
A properly anchored erosion control blanket to keep the mulch in place.
A special permit is required.
Only straw must be used.
Only HECPs are permitted.
A properly anchored erosion control blanket to keep the mulch in place.
Topsoiling is a practice of …
Surface stabilization
Site preparation
Sediment Control
Runoff conveyance
Site preparation
Check dams: When is it necessary to excavate a shallow keyway across a channel?
In every check dam installation.
Never.
In compacted soils only.
In highly erosive soil conditions.
In highly erosive soil conditions.
The minium aggregate depth of a construction exit bad is:
12 inches
9 inches
3 inches
6 inches
6 inches
Sodding is a practice of …
Surface stabilization
Sediment Control
Site preparation
Runoff conveyance
Surface stabilization
Chemical Stabilization: Applying products like polyacrylamide (PAM) near natural water bodies …:
can improve receiving water quality.
is prohibited by the Clean Water Act.
requires the establishment of a buffer zone.
requires the establishment of a buffer zone.
Which 24-hour design storm criteria is typically used for permanent diversions?
2 to 5-year
100-year
10 to 50-year
10 to 100-year
10 to 50-year
Preservation of Vegetation: Site clearing should never be closer than
5 feet to a branch of a tree.
5 feet to the trunk of a tree.
50 feet to the trunk of a tree.
15 feet to the trunk of a tree.
5 feet to the trunk of a tree.
How is water from a sediment basin discharged under normal operating conditions?
Through a floating skimmer
It is not discharged, it is infiltrated
Through the storm drain
Through the spillway
Through a floating skimmer
Which 24-hour design storm criteria is typically used for temporary diversions on construction sites?
10 to 50-year
100-year
10 to 100-year
2 to 5-year
2 to 5-year
A favorable pH range for plant growth is usually:
4.0-8.0
7.0-8.0
6.0-6.5
6.0-7.5
6.0-6.5
Check dams are used for drainage areas of
5 acres or less.
1 acre or less.
1 acre and more.
10 acres or less.
1 acre or less.
Retaining wall is a practice of …
Site preparation
Sediment Control
Runoff conveyance
Surface stabilization
Surface stabilization
What is the proper seedbed preparation for permanent seeding?
Tillage to a depth of 6 inches, application of lime and fertilizer.
Tillage to a depth of 6 inches, application of fertilizer.
Tillage to a depth of 6 inches.
Tillage to a depth of 6 inches, application of lime.
Tillage to a depth of 6 inches, application of lime and fertilizer.
Erosion control blanket is a practice of …
Surface stabilization
Site preparation
Sediment Control
Runoff conveyance
Surface stabilization
Chemical stabilization is a practice of …
Sediment Control
Runoff conveyance
Site preparation
Surface stabilization
Surface stabilization
Floating turbidity barrier is a practice of …
Runoff conveyance
Site preparation
Surface stabilization
Sediment Control
Sediment Control
Floating turbidity barrier is a practice of …
Runoff conveyance
Site preparation
Surface stabilization
Sediment Control
Sediment Control
Filter strip is a practice of …
Surface stabilization
Site preparation
Sediment Control
Runoff conveyance
Sediment Control
Flocculants have to be used together with which best management practice?
Floating Turbidity Barrier.
Mulching.
Sediment Barrier.
Sediment Basin.
Sediment Basin.
Check dams have to be lined with
Straw.
Erosion control blankets.
Woven geotextile.
Non-woven geotextile.
Non-woven geotextile.
Preservation of vegetation is a practice of …
Site preparation
Runoff conveyance
Surface stabilization
Sediment Control
Surface stabilization
In a seeded area, what percentage of the ground surface should be visible after mulching?
30%
50%
5%
25%
25%
Mulching is a practice of …
Runoff conveyance
Surface stabilization
Site preparation
Sediment Control
Surface stabilization
Check dams can be build as:
rock, wattle, silt fence, or sand bag check dam.
rock, silt fence, or sand bag check dam.
rock, wattle, or sand bag check dam.
wattle, silt fence, or sand bag check dam.
rock, wattle, silt fence, or sand bag check dam.
Check dam is a practice of …
Runoff conveyance
Sediment Control
Surface stabilization
Site preparation
Runoff conveyance
Rock check dams should be installed with side slopes
2:1 or steeper.
1:2 or steeper.
2:1 or flatter.
1:2 or flatter.
2:1 or flatter.
Permanent seeding is a practice of …
Runoff conveyance
Sediment Control
Site preparation
Surface stabilization
Surface stabilization
Check dams
Reduce turbidity.
Improve infiltration capacities.
Reduce runoff.
Reduce channel erosion.
Reduce channel erosion.
Erosion Control Blanket: Which of the following provides erosion protection for 1 to 5 years?
Netting
Biodegradable Erosion Control Blanket
Permanent Erosion Control Blanket
Turf Reinforcement Mat
Biodegradable Erosion Control Blanket
Construction exit pad is a practice of …
Sediment Control
Runoff conveyance
Surface stabilization
Site preparation
Site preparation
The minimum width of a construction exit bad is:
As required
50 feet
25 feet
30 feet
As required
How can you ensure that water runs over a check dam and not around it?
Materials are positioned to form a hyperbolic top perpendicularly to the channel flow.
The crest of the dam is installed level.
Materials are positioned to form a parabolic top perpendicularly to the channel flow.
A non-woven geotextile is positioned on the dam.
Materials are positioned to form a parabolic top perpendicularly to the channel flow.
Grass swale is a practice of …
Site preparation
Surface stabilization
Runoff conveyance
Sediment Control
Runoff conveyance
Temporary seeding is a practice of …
Surface stabilization
Runoff conveyance
Sediment Control
Site preparation
Surface stabilization
The minimum length of a construction exit bad is:
25 feet
As required
50 feet
30 feet
50 feet
Sediment basin is a practice of …
Runoff conveyance
Sediment Control
Surface stabilization
Site preparation
Sediment Control
Permanent seeding: If a soil test is not available, what is the recommended application rate of lime?
1 tons / acre on clayey and 2 ton / acre on sandy soils.
0.5 tons / acre.
2 tons / acre.
2 tons / acre on clayey and 1 ton / acre on sandy soils.
2 tons / acre on clayey and 1 ton / acre on sandy soils.
How is water from a sediment basin discharged during high rainfall?
Through a floating skimmer
Through the storm drain
It is not discharged, it is infiltrated
Through the spillway
Through the spillway
Outlet protection is a practice of …
Runoff conveyance
Sediment Control
Site preparation
Surface stabilization
Runoff conveyance
If installed correctly, check dams may capture
Mainly silt-sized sediments.
Suspended, clay-size sediments.
Mainly coarser sediments.
Mainly coarser sediments.
Flocculant is a practice of …
Sediment Control
Site preparation
Runoff conveyance
Surface stabilization
Sediment Control
Erosion Control Blanket: Which of the following provides erosion protection similar to stone or concrete liners?
Turf Reinforcement Mat
Netting
Permanent Erosion Control Blanket
Biodegradable Erosion Control Blanket
Turf Reinforcement Mat