Module 12 - Erosion and Sediment Control BMPs in Alabama Flashcards
Erosion Control Blanket: Which of the folling provides only the minimum amount of erosion resistance?
Biodegradable Erosion Control Blanket
Permanent Erosion Control Blanket
Turf Reinforment Mat
Netting
Netting
Inlet protection is a practice of …
Runoff conveyance
Site preparation
Sediment Control
Surface stabilization
Sediment Control
Which cross-sectional grass swale shapes are common?
Parabolic and triangular.
Round.
Triangular, parabolic, or trapezoidal.
Trapezoidal.
Triangular, parabolic, or trapezoidal.
When mulching a sloped area …
A properly anchored erosion control blanket to keep the mulch in place.
A special permit is required.
Only straw must be used.
Only HECPs are permitted.
A properly anchored erosion control blanket to keep the mulch in place.
Topsoiling is a practice of …
Surface stabilization
Site preparation
Sediment Control
Runoff conveyance
Site preparation
Check dams: When is it necessary to excavate a shallow keyway across a channel?
In every check dam installation.
Never.
In compacted soils only.
In highly erosive soil conditions.
In highly erosive soil conditions.
The minium aggregate depth of a construction exit bad is:
12 inches
9 inches
3 inches
6 inches
6 inches
Sodding is a practice of …
Surface stabilization
Sediment Control
Site preparation
Runoff conveyance
Surface stabilization
Chemical Stabilization: Applying products like polyacrylamide (PAM) near natural water bodies …:
can improve receiving water quality.
is prohibited by the Clean Water Act.
requires the establishment of a buffer zone.
requires the establishment of a buffer zone.
Which 24-hour design storm criteria is typically used for permanent diversions?
2 to 5-year
100-year
10 to 50-year
10 to 100-year
10 to 50-year
Preservation of Vegetation: Site clearing should never be closer than
5 feet to a branch of a tree.
5 feet to the trunk of a tree.
50 feet to the trunk of a tree.
15 feet to the trunk of a tree.
5 feet to the trunk of a tree.
How is water from a sediment basin discharged under normal operating conditions?
Through a floating skimmer
It is not discharged, it is infiltrated
Through the storm drain
Through the spillway
Through a floating skimmer
Which 24-hour design storm criteria is typically used for temporary diversions on construction sites?
10 to 50-year
100-year
10 to 100-year
2 to 5-year
2 to 5-year
A favorable pH range for plant growth is usually:
4.0-8.0
7.0-8.0
6.0-6.5
6.0-7.5
6.0-6.5
Check dams are used for drainage areas of
5 acres or less.
1 acre or less.
1 acre and more.
10 acres or less.
1 acre or less.
Retaining wall is a practice of …
Site preparation
Sediment Control
Runoff conveyance
Surface stabilization
Surface stabilization
What is the proper seedbed preparation for permanent seeding?
Tillage to a depth of 6 inches, application of lime and fertilizer.
Tillage to a depth of 6 inches, application of fertilizer.
Tillage to a depth of 6 inches.
Tillage to a depth of 6 inches, application of lime.
Tillage to a depth of 6 inches, application of lime and fertilizer.
Erosion control blanket is a practice of …
Surface stabilization
Site preparation
Sediment Control
Runoff conveyance
Surface stabilization