Module 1 Flashcards

1
Q

Workflow type - Linear

A

Business process proceeds from one location to another in a strict sequence

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Workflow type - Centralized

A

Work is controlled by a centralized position

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Workflow type - Departmental

A

Hierarchical, one group controlling work divided into separate departments

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Workflow type- Network

A

No strict organized method of workflow

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Describe Project Drivers

A

Gathering information about the client (or stakeholders) and user needs. It involves…
Organization structure and goals
Functional, behavioral, and cultural needs
Budget; existing conditions, codes, and other external considerations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who are stakeholders of a project?

A

Those who control, work on, or have an interest in the project

examples: owner, members of the owner’s team, investors, users of the facility, the interior designer’s team, consultants, and adjacent tenants or property owners

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is pre-design

A

Consists of all of the work before schematic design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is Project Scope

A

all of the work the designer agrees to perform in exchange for the fee

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Project scope is required for…

A

determining the fee
writing the contract
defining who and what on a project

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Pre-design may include

A

Researching project type and client
Determining project scope and stakeholders
Identifying the design team
Selecting consultants
Setting up files
Determining construction delivery methods
Programming

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Factors that alter identifying the design team

A
  • size and scope of the project
  • the number and complexity of required tasks
  • the schedule
  • available personnel in the office
  • experience of team members
  • other project obligations
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Method of project construction depends on

A
  • Project size and complexity
  • Schedule
  • How risks are to be assigned
  • Clients need for a guaranteed cost
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Before design begins, the logistics of completing the work must be determined. They are…

A
  • Identifying design team
  • What consultants will be needed
  • How the project files will be kept
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Types of construction methds

A

Design-Bid-Build
Fast-Track Construction
Design-Build

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Five-step programming process

A

Establish goals
Collecting and analyzing facts
Uncovering and testing concepts
Determine needs
Stating the problem

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
A