Miscellaneous Numbers Flashcards

1
Q

NDE - Minimum number of RT’s required on a circular shell replacement plate

A

1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

FFS – Current joint efficiency “E” in API 650

A

1.0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

FFS – Joint Efficiency “E” – Calculating tmin for an LTA, when LTA is away from rivets by > 6”
-

A

1.0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

FFS – Joint Efficiency “E” – Calculating tmin for an LTA, when LTA is away from weld by greater of: 1” or 2t

A

1.0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Reconstruction - Number of sets of center punch marks located on top and bottom edges of each shell piece

A

2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Weld Qualification - Number of tension tests to qualify a WPS

A

2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Weld Qualification - Number of bend tests to qualify a welder or welding operator in welding positions 1G-4G

A

2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

NDE - Minimum # of exposures to RT 360o of a weld using a double-wall technique, double-wall view (elliptical shot)

A

2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

NDE - RT film Density Range - allowed for the weld & IQI when using a gamma ray source

A

2.0 - 4.0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

NDE - Minimum # of exposures to RT 360o of a weld using a double-wall technique, single-wall view

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Impact Test - Number of test bars required in each set of impact test specimens

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

NDE - When using a shim under a hole-type IQI, the number of sides of the IQI that must be seen in the RT image

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Hot Tap - Minimum number of UT readings around the circumference of a new hot tapped nozzle

A

4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Weld Qualification - Number of bend tests to qualify a WPS

A

4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Weld Qualification - Number of bend tests required to qualify a welder in welding positions 5G & 6G

A

4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

FFS - Corrosion Averaging in a Shell LTA - Minimum # of UT readings to take on each designated vertical line.

A

5

17
Q

NDE - Minimum number of RT’s required on a square or rectangular shell replacement plate

A

6

18
Q

Settlement - Minimum number of settlement points around circumference

A

8

19
Q

Roofs - Maximum amount of primary seal that can be removed for repair while tank is still in service

A

1/4