Mining Methods, Mine Ventilation, Mine Safety Flashcards
1
Q
- In a mine with 2,000 employees where 100 were on sick leave and another 100 were on vacation leave for a particular month, there were 18 lost time accidents. Assuming the employees worked for 25 days (for 8 hours) and no one worked overtime, what was the accident frequency rate per million manhours?
a. 50
b. 45
c. 100
d. 75
e. None of these
A
A
2
Q
- The costliest method in underground mining
a. Square set stoping
b. Cut and fill stoping
c. Room and pillar
d. Shrinkage stoping
A
A
3
Q
- Used to measure moderate-velocity airflow
a. Pitot tube
b. Smoke-cloud generator
c. Vane anemometer
d. Any of these
A
C
4
Q
- Any source of potential damage, hard, or adverse health effects on something or someone
a. Risk
b. Hazard
c. Safety
d. Accident
e. Risk assessment
A
B
5
Q
- Sublevel block caving is a hybrid between sublevel caving and block caving introduced to counter
a. Drilling and blasting problems in sublevel caving
b. Draw control problems in block caving
c. Problems in sublevel caving due to dilution and mining at depth
d. Problems in block caving regarding stability, reinforcement, and secondary blasting problems
A
D
6
Q
- The losses in energy due to the roughness of the wall
a. Rubbing surface
b. Static pressure losses
c. Frictional pressure losses
d. None of these
A
C
7
Q
- In class B mine, the safety engineer required should be
a. One full time
b. One part time
c. At least one
d. One full time and one part time
A
A
8
Q
The threshold limits value of carbon dioxide as per “Revised Mine Safety Rules and Regulations”
a. 1.00% by volume
b. 0.75% by volume
c. 0.50% by volume
d. 0.25% by volume
A
C
8
Q
- A system of transporting ore consisting essentially of head frame, head sheaves, winding machine and winding ropes:
a. Conveyor transport
b. Trackless transport
c. Rail transport
d. Hoisting
A
D
9
Q
- Pressure exerted by the air on the walls of the containing vessel
a. Total pressure
b. Static pressure
c. Dynamic pressure
d. Frictional pressure
A
B
10
Q
- The unsupported underground mining methods can be used in any type except:
a. Hydrothermal deposits
b. Vein type deposits
c. Placer deposits
d. Bedded deposits
A
C
11
Q
- Tailings and slurries may be used as backfill in a subsidence area
a. True
b. False
c. Permissible
d. Depending on the specific gravity
A
B
12
Q
- A product of mine explosion and is given off by gasoline motors and during detonation of negating oxygen-balanced explosives
a. Carbon dioxide
b. Nitrogen dioxide
c. Carbon monoxide
d. Methane
A
C
13
Q
- The percentage of time the equipment is available to perform its intended function over a defined period of time when it is required by operation
a. Production time
b. Physical availability
c. Mechanical availability
d. Percent utilization
e. Both C and D
A
C
14
Q
- Investigation reports discussing the severity of an accident in case of fatal or serious accident shall be made
a. Within 7 calendar days from the date of the accident
b. Within 15 calendar days from the date of the accident
c. Within 21 calendar days from the date of the accident
d. Within 30 calendar days from the date of the accident
e. Should be made within 24 hours from the onset of the accident
A
B
15
Q
- Mine gas that supports combustion
a. Carbon dioxide
b. Carbon monoxide
c. Hydrogen sulfide
d. Oxygen
e. Nitrous oxide
A
D
16
Q
- An excavator loads dump trucks in a mining operation. The excavator has a cycle time of 2 minutes. Each dump truck has a capacity of 80 tons and requires 8 buckets to fill. Determine the number of dump trucks that can be loaded per hour, assuming an 80% utilization rate
a. 5 units
b. 4 units
c. 7 units
d. 3 units
e. None of these
A
D
17
Q
- The ideal number of members of a miner rescue team should be
a. 5
b. 7
c. 9
d. 10
e. At least 3
A
A
18
Q
- Validity of all safety engineer/safety inspector permits
a. 1 year
b. 2 years
c. 3 years
d. 4 years
e. 5 years
A
C
19
Q
- In the context of mine production optimization, which of the following factors can contribute to increased operational efficiency and productivity
a. Adequate maintenance and minimized equipment breakdowns
b. Inefficient resource allocation and scheduling
c. Lack of data collection and analysis
d. Underutilized equipment and low equipment availability
e. None of the above
A
A