Materials & Resources Flashcards
Option Building Product Disclosures
1-2 points
Options 1 & 2 follow 200% rule if working 10 miles
Options 2 & 3 can be combined for the 25% totals but cannot double count
Structural & enclosure items no more than 30%
Include furniture and furnishings
Option 1: Material Ingredient Reporting
1 Point 20 materials / 5 manufacturers 200% value if within 100 miles Manufacturer Inventory Health Product Declaration Cradle to Cradle v2 Basic C2C v3 Bronze USGBC Approved Program Declare ANSI/BIFMA
Option 2: Material Ingredient Optimization
25% by cost
1 point
200% value if within 100 miles
Cost * Location Value * Program Value
GreenScreen v1.2 Benchmark
List Translator 100% Cost
List Full Assessment 150% Cost
Cradle to Cradle Certified
v2 Gold 100% of cost
v2 Platinum 150% of cost
v3 Silver 100% of cost
v3 Gold & Platinum 150% of cost
Reach Optimization
Contains no items listed, 100% of cost
USGBC Approved Program
Comply with accepted products
Option 3: Product Manufacturing Supply Chain
25% by cost
Valued at 100% of their value
- Validated health & safety & 99% of ingredients
- Independent Third Party Certification
Materials & Resources Section Points
13 points
2 PR:
Storage & Collection of Recyclables
Construction & Demo Waste Mngmt
1/4/2/2/2 Long Commitment Interiors LC impact reduction EPDs Sourcing Raw Materials Materials Ingredients Construction & Demo Waste Management
PR: Storages and Collection of Recyclables
5 bins : mixed paper/cardboard/glass/plastics/metal
2 of the following:
Batteries/Mercury-containing lamps/Electronic Waste
Safe Collection
2 of the following:
Batteries
Mercury-containing lamps
Electronic Waste
Retail Adaptations
24 audit, pick top 4
PR: Construction & Demo Waste
Develop Construction & Demo Waste Management Plan
- 5 materials
- Determine whether separated or Co-mingled
- Report on disposal and diversion rates
Materials & Resources - Waste Management : Option 1 Diversion
1-2 points
Path 1: 50% diversion, 3 materials
Path 2: 75% diversion, 4 materials
By weight or volume
Materials & Resources - Waste Management : Option 2 Max Waste
No more than 2.5 lbs/ft2
Does not include: soil, land debris or alternative daily cover
Waste Diversion Calculation
Waste Diverted / Total Waste x 100
Waste to Energy
When diversión not available
Materials Resources - Longterm Credit
10 year lease
Materials & Resources Credit - Interior LC Impact Reduction
4 points
Option 1 : 2 points
Option 2 : 1 point
Option 3 : 1 point
Materials & Resources Credit - Interior LC Impact Reduction : Option 1 Interior Resuse
Reuse up to 50% of the surface area
- Renovate and improve the interior
- Breathe new life into disadvantaged areas
- Reduce construction waste
Materials & Resources Credit - Interior LC Impact Reduction : Option 2 Furniture Reused
30% by cost
- Determined by cost
Materials & Resources Credit - Interior LC Impact Reduction : Option 3 Design for Flexibility
- Accessible systems (50% floor area)
- Movable / Demountable (50%)
- Labelling (50% by cost)
- Take-back system (1 major component)
- Reusable/recyclable (50% by cost)
- Flexible Power (50% by floor area)
- Flexible Lighting (50% by load)
Reuse Calculation
(Surface Reused / (existing building surface area - hazardous surface area) ) x 100
- Exclude building windows and doors
- Exclude structural elements
Materials & Resources : Option 1 Disclosure
- Determined by no. of products
- Encourage manufacturers to disclose their materials
- Passive MEP included
- Defined by the function it serves